Commissioning and Operation
88
AVENTICS
| PROFINET-IO | R412015162–BDL–001–AE
Fig. 6:
(A) S3.1–S3.8 monitoring threshold for valve voltages
(see Table 19 on page 92); (B) switch S4, S5, S6, S7 for
assignment of valve supply voltages (U
Q1
, U
Q2
) on bus coupler
with M12 plug (see Table 16 on page 88)
On a bus coupler with 7/8" plug, the valve power supply is via
a push-in fitting (see
B
in Fig. 7). The valve supply assignment
cannot be set here on the bus coupler.
Fig. 7:
(A) S3.1–S3.8 monitoring threshold for valve voltages (see
Table 19 on page 92); (B) 7/8" push-in fitting for valve power
supply
This switch allows valves to be assigned in groups to supply
voltages U
Q1
and U
Q2
. When delivered, all valves are assigned
to the U
Q1
voltage.
B
A
S4
S5
S6
S7
U
U
12
34
5
6
U
On
Off
Q2
U
Q1
S3.8
S3
S3.7
Off
On
1
2
Q1
Q2
B
A
12
34
5
6
U
On
Off
Q2
U
Q1
S3.8
S3
S3.7
Off
On
1
2
Table 16:
Assignment of the S4, S5, S6, and S7 switches
Switches
Byte
Double subbases for double solenoid
valves (solenoids 12, 14)
Double subbases for single solenoid
valves (solenoid 14)
S4
0
1 – 4
1 – 8
S5
1
5 – 8
9 – 16
S6
2
9 – 12
17 – 24
S7
3
13 – 16
25 – 32
Summary of Contents for PROFINET-IO
Page 2: ......
Page 114: ...Disposal 114 AVENTICS PROFINET IO R412015162 BDL 001 AE...
Page 174: ...Elimination des d chets 174 AVENTICS PROFINET IO R412015162 BDL 001 AE...
Page 236: ...ndice 236 AVENTICS PROFINET IO R412015162 BDL 001 AE...
Page 347: ...Nyckelordsregister AVENTICS PROFINET IO R412015162 BDL 001 AE 347 Svenska...