
Installing a New System
Introduction - Page 10
Installation & Maintenance
Installing a New System - Page 10
INDeX 30
38DHB0002UKDF- Issue 4 (07/2001)
Installing a New System
Introduction
Before proceeding with installation, ensure that you have read the notes covered in
Pre-Installation.
This chapter covers :
– "Unpacking" on page 10
– "Wall Mounting" on page 11
– "PSU Test" on page 12
– "Install Optional Battery Back-up Kit" on page 12
– "Basic System Programming" on page 18
– "Connecting to the MDF" on page 15
Unpacking
Unpacking and checking :
1. Do not start unpacking until the equipment is at the site of installation.
2. Before unpacking check for any signs of damage that has occurred during
transit. If any damage exists bring it to the attention of the carrier.
3. Check all cartons against the packing slip. Report any errors or omissions to the
equipment supplier.
4. Whilst unpacking the equipment, retain all the packaging material. Fault returns
are only accepted if repackaged in the original packaging.
5. Visually inspect each item and check that all the necessary documentation and
accessory items have been included. Report any errors or omissions to the
dealer who supplied the equipment.
6. Ensure you read and understand any documentation included with any item.