Upgrading R5si/R6si to an Avaya DEFINITY Server R
EPN running Avaya Communication Manager
555-233-115
4-32
Issue 7 November 2003
Install Front Ground Plates (Systems with
Earthquake Protection)
Use 1 front ground plate between 2 stacked cabinets.
1. At the front of the cabinets, align the holes in the top of the front ground
plate with the holes at the bottom of the upper cabinet, and insert the 4
screws. Do not tighten the screws yet. See
2. At the front of the cabinets, align the holes in the bottom of the front ground
plate with the holes at the top of the lower cabinet. Insert the 4 supplied
#12-24 x 1/2-inch (1.27 cm) thread-forming screws. Do not tighten the
screws yet.
3. Repeat Steps 1 and 2 until all stacked cabinets are fastened together.
4. Tighten all screws securely.
Figure 4-6.
Rear Ground Plate and Front Plate or Cabinet Clip
—
Side View
Figure Notes
1. Front Ground Plate or Cabinet Clip
2. Battery
3. Rear Ground Plate
3
2
1
grdpltec LJK 031096