Installation Guidelines
10
Determining the Location for the Base Units
Installation and Use
9
After all of the Avaya 3810 Wireless Telephones are covered on your floor
plan, perform one of the following steps:
— If you have one to three base units, install each base unit at least five
feet apart in the selected location. Be sure to install each base unit as
high as possible so it clears nearby objects (for example, office
cubicles and file cabinets). This grouping of base units is referred to as
a cluster.
— If you have four or more base units:
a Install three of the base units in the selected location,
with each base unit being five feet away from another
base unit. Be sure to install each base unit as high as
possible so it clears nearby objects (for example, office
cubicles and file cabinets). This grouping of base units is
referred to as a cluster.
b
Select a location that is at least 30 feet away from the
cluster, and install another cluster of up to three base
units. Within this new cluster, make sure each base unit
is five feet away from another base unit. Be sure to
install each base unit as high as possible so it clears
nearby objects (for example, office cubicles and file
cabinets).
c
Repeat Step b until all of the base units are installed.
When you are finished determining the location for the base units, install the
base units and perform a test call from each handset. Be sure to walk to all areas
where the handset will be used so you can determine whether the voice quality is
acceptable.
Summary of Contents for 3810
Page 2: ......