Complete install

4

Test each charger:

• 

Turn on power (to one unit at a time, if possible).

• 

Verify  that  top  light  is  steady  blue,  otherwise  refer  to  the 

troubleshooting guide.

• 

Verify that lower-front lights show steady blue, otherwise refer to 

the troubleshooting guide.

• 

On the nameplate label on the front of each TurboDock, mark the 

correct box: 240V or 120V.

Inform the Account Manager that the TurboDock is ready with "open 

access".  If  the  AM  desires,  you  can  now  test  the  TurboDock  by 

charging a vehicle. 

INSTALLATION STEPS 

Summary of Contents for TurboDock

Page 1: ...ric Code NEC and all local codes In cases of conflict between local codes and the NEC local codes shall take precedence Verify with authority having jurisdiction Model TurboDock NOTICE TO ELECTRICIAN Leave this Installation Guide with the TurboDock AeroVironment EV Solutions TurboDock Charging Station INSTALLATION GUIDE Wall Mounted Installation ...

Page 2: ...10 24 Hex nuts 10 24 10 Toothed lock washers Wire nuts TurboDock Charge Module Wall mount enclosure cover Ground wire assembly Wall mount back plate 8 32 x long phillips head screws Thread forming screws Cable hanger Black L1 Green GND Red L2 or Neutral ...

Page 3: ...QUIRED 13 64 drill bit for 10 screw clearance holes 7 8 drill bit or hole saw for wire entry hole Drills as required for and 8 fasteners Drill or knockout punch for conduit fitting used Magnetic torpedo level 1 3 16 2 3 4 13 32 MOUNTING HOLES C L C L BOTTOM OF PEDESTAL REQUIRED HARDWARE NOT SUPPLIED Fasteners and or anchors appropriate for wall material and construction Qty 4 8 fasteners and or an...

Page 4: ...etween 39 and 49 above the access surface Access space be tween and around the wall mounts must also comply with the ADA Run the appropriate conduit and wiring from the service panel to the installation site per local code 12 AWG minimum Use a 20 Amp double pole circuit breaker for 240V service Level II charging or a 20 Amp single pole circuit breaker for 120V service Level I charging Open the wal...

Page 5: ...ooting guide Verify that lower front lights show steady blue otherwise refer to the troubleshooting guide On the nameplate label on the front of each TurboDock mark the correct box 240V or 120V Inform the Account Manager that the TurboDock is ready with open access If the AM desires you can now test the TurboDock by charging a vehicle INSTALLATION STEPS ...

Page 6: ...Specifications are subject to change without notice Images of the Charging Station Model TurboDock are representative production models may vary No portion of these materials may be duplicated used or disclosed without prior written permission from AeroVironment Inc Disclaimer This Installation Guide includes the latest information available at the time of printing AeroVironment Inc reserves the r...

Reviews: