3. Installation
3. Installation
3. Installation
3. Installation
3- 1. Installation Configuration
3- 1. Installation Configuration
3- 1. Installation Configuration
3- 1. Installation Configuration
- Input electrical connection: refer to specification (2- 1), and
should be checked before switch ON. And the Ground line
should be connected.
- Earth(- ) clamp with base metal, and ) with welding
electrode
- low humidity and low dust
- Flat and strong floor
- More than 30cm far from dry wall
- Operating temperature: - 10 ~ 40°C
- No rainy and direct sunshine
- Altitude should be below 1000m
3- 2. Input Electricity
3- 2. Input Electricity
3- 2. Input Electricity
3- 2. Input Electricity
- When using engine generator, the power should be 2 times of
rated input power.
- NFB should be connected with welding machine as one by one.
- Input power should be grounded as above picture.