Automationdirect.com Productivity2000 P2-08TRS Manual Download Page 2

 

www.productivity2000.com  

Tech Support 770-844-4200   

2

Important Hot-Swap Information

The Productivity2000 supports hot-swap! 

Individual 

modules can be taken offline, removed, and replaced 

while the rest of the system continues controlling your 

process. Before attempting to use the hot-swap feature, 

be sure to read the hot-swap topic in the programming 

software’s help file or our online documentation at 

AutomationDirect.com for details on how to plan your 

installation for use of this powerful feature.

QR Code

Use any QR Code reader application to 

display the module’s product insert.

Align

with slot

2

 rotate

to seated

position

Module Installation

WARNING:

 

Do not apply field power until 

the following steps are completed. See 

hot-swapping procedure for  

exceptions.

WIRE STRIP

LENGTH

WIRE STRIP

LENGTH

Step One: 

Align module 

catch with base slot and 

rotate module into  

connector.

Locked

Unlocked

Step Two: 

Pull top locking 

tab toward module face. Click 

indicates lock is  

engaged.

Step Three: 

Attach field wiring using the removable 

terminal block or 

ZIP

Link wiring  

system.

Caution: 

If possible, remove field power prior to  

proceeding. If not, then 

EXTREME

 care 

MUST 

be taken 

to prevent damage to the module, or even personal injury 

due to a short circuit from the live terminal block.

Reviews: