![Automatic Systems TR490 Installation Manual Download Page 2](http://html.mh-extra.com/html/automatic-systems/tr490/tr490_installation-manual_3021606002.webp)
Automatic Systems
TR490-NInstall-EN
p
2/16
D
ocument revisions
Rev
Date Written
by
Checked
by
Nature
02
2009-05-29
MFy
Replacement of AS1025 r02 board illustrations by
AS1025 r08 (included F1 fuse modification => 2,5 A
slow).
03
2009-08-27
MFy
Ambient operating t° modification.
04
2010-01-05
MFy
EC certificate update.
05
2011-03-24
MFy
Electric diagram 2TR604.006
rev B.
Table of contents
1. INTRODUCTION ...............................................................................................................
p.
3
2. GENERAL .........................................................................................................................
p.
4
2.1. General view ...................................................................................................................
p.
4
2.2. Switching
off
the equipment ........................................................................................... p. 5
2.3. General
conditions of use ............................................................................................... p. 5
2.4.
In case of power failure ..................................................................................................
p.
5
2.5.
Overall dimensions and installation plan ........................................................................
p.
6
3. INSTALLATION ................................................................................................................
p.
7
3.1. First step .........................................................................................................................
p.
7
3.2. Preliminary
work on site .................................................................................................
p.
8
3.3. Installing
the
tripod turnstile ............................................................................................
p.
8
3.4. Mounting
the tripod arms ................................................................................................ p. 9
3.5. Electrical
connections
and initial power-up ....................................................................
p. 10
3.6. Check list ........................................................................................................................
p. 11
3.7. Temporary dismantling ................................................................................................... p. 11
3.7.1. Disconnecting
the equipment ..........................................................................
p. 11
3.7.2. Dismounting
the
tripod arms ...........................................................................
p. 11
3.7.3. Removing
the unit ........................................................................................... p. 12
3.8.
Scrapping the equipment ................................................................................................
p. 12
4. ELECTRICAL
DIAGRAMS .................................................................................................. p. 13
5. EC
CERTIFICATE .................................................................................................. ........ p. 16