
Operation instructions for road gates AG/500, AG/900, AG/M1
© Autogard spol. s r.o. 2004
5
Foundation kit positioning
The road gate is installed on fast mounted (on the concrete base, welded to iron ground etc.)
foundation kit, which include foundation plate and 4 long screws M12 along with females intended for
the concreting. The gate base make no a less then 600 mm, power supply and signal cables brings
cable guard, including the cable from car detector loop (like on the picture).
! WARNING !
Power supply alimentation have to include device enabling disconnecting of the cable
in which the distance of disconnected contacts is on less than 3 mm.
Foundation plate:
[mm] AG/500
AG/M1
AG/900
X
260
310
Y
150
170
A
350
450
B
310
350
Design of the concrete gate base with foundation kit: