Overview
You can link object and viewpoint animations to your construction schedules, and enhance the quality of
simulations. For instance, you can start your simulation with a camera showing an overview of the whole project,
and then, as the tasks are simulated, zoom into specific areas for a detailed view of the model. You can also play
animation scenes as the tasks are simulated. For example, you can animate the arrival and depletion of the
material stock piles together with the vehicle movements, and monitor the vehicular access to site.
You can add animation to an entire schedule, to individual tasks within a schedule, or combine these methods
together to achieve the desired effect.
To record animation, see “
Create and Edit Viewpoint Animations
” on page 251 and “
”
on page 285.
It is also possible to add scripts to the tasks in your schedule. By doing this, you gain control over the animation
properties. For example, you may be able to play different animation segments as the tasks are simulated, or play
animations backwards and so on.
To record scripts, see “
” on page 294.
Add Animation to an Entire Schedule
The animation that you can add to an entire schedule is restricted to viewpoints, viewpoint animations, and
cameras.
Added viewpoint and camera animation will be automatically scaled to match the playback duration.
Once you’ve added an animation to your schedule, you can
To add a current viewpoint or a viewpoint animation
1
If the TimeLiner window is not already open, click Tools
➤
TimeLiner.
2
Select the required viewpoint or viewpoint animation on the Viewpoints dockable window
3
In the TimeLiner window, click the Simulation tab, and click the Settings button.
4
In the Simulation Settings dialog box, click the drop-down arrow in the Animation field, and select Saved
Viewpoints Animation.
Overview | 367
Summary of Contents for 507B1-90A211-1301 - NavisWorks Manage 2010
Page 1: ...Autodesk Navisworks Manage 2010 User Guide March 2009 ...
Page 12: ...xii Contents ...
Page 14: ...2 Part 1 Welcome to Autodesk Navisworks Manage 2010 ...
Page 64: ...52 Chapter 3 Installation ...
Page 97: ...Get a Whole Project View 85 ...
Page 98: ...86 Part 2 Get a Whole Project View ...
Page 136: ...124 Chapter 5 Work with Files ...
Page 178: ...To toggle ViewCube Click View Head Up Display ViewCube 166 Chapter 6 Explore Your Model ...
Page 262: ...250 Chapter 9 Use Viewpoints and Sectioning Modes ...
Page 270: ...258 Chapter 11 Work Within a Team ...
Page 282: ...270 Chapter 12 Share Data ...
Page 346: ...334 Chapter 14 Create Photorealistic Visualizations ...
Page 460: ...448 Chapter 17 Autodesk Navisworks Reference ...
Page 466: ...454 Glossary ...