If you modify one of the elements in a pair, a warning indicates that a monitored element has
changed. You can review those warnings using the Coordination Review tool. See
Review on Element Relationships
on page 1293.
Stopping Element Monitoring
To stop element monitoring, select a monitored element, and click Modify <element>
tab
➤
Monitor panel
➤
Stop Monitoring.
Coordination Review on Element Relationships
Whenever you modify monitored elements, a coordination monitor warning displays. You can review these
warnings using the Coordination Review tool and decide what action to take.
You can review warnings between elements in the current project, or between elements in a linked project
and a host project.
Warnings can occur because of these violations:
■
An original monitored element from the linked project has changed.
■
A copied monitored element in the host project has changed.
■
Both the original monitored element and the copied element have changed.
■
The original element in the linked file was deleted.
■
The copied element in the host file was deleted.
To review warnings about project changes:
1
Click Collaborate tab
➤
Coordinate panel
➤
Coordination Review drop-down
➤
Use Current
Project if you want to check warnings between elements in the current project, or click
Collaborate tab
➤
Coordinate panel
➤
Coordination Review drop-down
➤
Select Link to check
warnings between the linked and the host projects.
If you chose Select Link, click the link in the drawing area.
The Coordination Review dialog displays. If you are running a review on the current project,
click the In host project tab. If you are running a review on a link and the host project and
linked project are linked, both the In host project tab and the In-a-linked-project tab display.
The dialog displays an expandable tree of all the warnings between monitored elements.
2
Expand the Message branch to display the element warning groups.
3
Continue to expand the branches until you see a value for the Action heading.
On this dialog are several options:
■
Do nothing: Take no action on the element. Changes the message status so that it can be
filtered out or considered later.
■
Reject (in a host project tab only): There is a difference between an element in the host file
and its associated monitored element. The change made to the element in the host file is
incorrect, and a change must be made to the associated monitored element.
■
Accept difference (in a host project tab only): Accepts the change made to the element and
updates the relationship. For example, if a pair of grids were 200 mm apart, and one was
moved to 300 mm away, the change would be accepted, and the relationship would now be
set to 300 mm.
Coordination Review on Element Relationships | 1293
Summary of Contents for 256B1-05A761-1301 - AutoCAD Revit Structure Suite 2010
Page 1: ...Revit Architecture 2010 User s Guide March 2009 ...
Page 4: ......
Page 42: ...xlii ...
Page 84: ...42 ...
Page 126: ...84 ...
Page 166: ...124 ...
Page 229: ...Schedule Field Formatting Calculating Totals Specifying Schedule Properties 187 ...
Page 230: ...Schedule with Grid Lines Schedule with Grid Lines and an Outline 188 Chapter 5 Project Views ...
Page 304: ...262 ...
Page 427: ...Defining the first scale vector Defining the second scale vector Resizing Graphically 385 ...
Page 454: ...Before painting applying material to stairs 412 Chapter 8 Editing Elements ...
Page 456: ...414 ...
Page 486: ...444 ...
Page 674: ...632 ...
Page 809: ...Curtain wall Curtain Grid Curtain Walls Curtain Grids and Mullions 767 ...
Page 994: ...952 ...
Page 1016: ...974 ...
Page 1204: ...1162 ...
Page 1290: ...1248 ...
Page 1318: ...1276 ...
Page 1372: ...1330 ...
Page 1382: ...1340 ...
Page 1462: ...1420 ...
Page 1492: ...1450 ...