Auto Meter BVA-260 Operator'S Manual Download Page 9

16

9

1

HOOK UP

Press the On/Off button: Connect the clamps as instructed on the LCD.

Note:

 Go to the setup to change 

temp scale to centigrade. The 

temperature request only appears 

once for each battery tested.  If the 

clamps are disconnected you will 

be prompted again to begin a new 

battery test.

CONNECTION ERRORS

If the clamps are reversed the Reversed Connection warning will be 

displayed on the LCD with an audible beeping.

If one or both of the clamps are not in complete contact (both the copper 

and silver jaw) CHECK CONNECTIONS! will flash on the LCD.

If manufacturer's specifications are not available the chart below can be used as 

a general guideline. The amounts are in Amps.

There are a few points to consider in testing a starting system on a diesel engine. 

The BVA-260 is designed to recognize any significant amount of draw; this 

includes glow plugs in small diesel engines. In heavy-duty applications consider 

computer and accessory draw. 

Make sure you start the engine quickly. The engine should be warm.

Turn the ignition on and allow the glow plugs to heat up and click off before you

run the Starting Test.

Repeat the test in different ways and compare results.

If the results are out of specification do the following:

Inspect the connectors for excessive voltage drop.

Repair or replace any defective cables or connectors.

Retest the system.

STARTER TEST cont

If still out of specifications: 

High 

Amp reading may indicate engine is out of time 

or a faulty starter. Some possible causes are shorted windings, bent armature, 

broken housing or bad bearings.

STARTING CURRENT DRAW AND DIESEL ENGINES

 

IF ALL CK GOOD

RECOMMEND BENCH 

TESTING STARTER

Use the (+ Up) and (- 

Down)  keys to scroll 

through the screens. 

Press Y or N to go to 

the main menu.

650A

AUTO METER

BVA-260

07/07/10 10:00AM

'Y' FOR MENU

Connect Black 

Clamp to Negative

 (-) Terminal

Connect Red 

Clamp to 

Positive (+) 

Terminal

Use the side terminal feature on the clamp to connect battery side terminals. 

When testing dual post batteries always check the post to which the system is 

attached.

Summary of Contents for BVA-260

Page 1: ...mate hand held tester It is the auto industry s answer to portability in a professionally accurate load tester and system analyzer Auto Meter Products Inc 350 West Center Street Pleasant Grove Utah 84...

Page 2: ...turning the Test Equipment to package the tester properly to prevent any damage during return shipment Repair costs for such damages will be charged back to shipper customer returning the Test Equipme...

Page 3: ...he Auto Meter high speed PR 16 printer using the Auto Meter XTC 160 charger tester and IR 1 printer interface choose XTC 160 PR 16 To print to a network printer using the POSI 160 choose Print Center...

Page 4: ...o remove car exhaust In extremely cold temperatures check for frozen electrolytic fluid before applying load Do not attempt to Load Test or charge a battery under 20 degrees Allow the battery to warm...

Page 5: ...he BVA 260 It takes a moment to send all the test data The BVA 260 also operates the AC 14 printer installed in Auto Meter s XTC 160 tester charger or BVA 2100 heavy duty tester analyzer INSPECTION Va...

Page 6: ...off key Y Enter Key This key selects the next menu the cursor line item and answers yes to a test progression N Esc Key This key cancels a test or progression It also returns to the previous menu Up K...

Page 7: ...ins the smaller gauge wire that reads the voltage and the other jaw connects to the larger conducting wire that draws the load in each test Electrical insulation between jaws is necessary for accurate...

Page 8: ...age regulator Bar at the bottom of the screen will show the tests progress The BVA 260 will allow the voltage to stabilize before starting the test bar at the bottom of the screen that shows the test...

Page 9: ...computer and accessory draw Make sure you start the engine quickly The engine should be warm Turn the ignition on and allow the glow plugs to heat up and click off before you run the Starting Test Rep...

Page 10: ...ess the Up key to move to the previous screen IF ALL CK GOOD RECOMMEND BENCH TESTING STARTER Select Battery Test from the main menu and then press Y Enter Press the Up or Down key to increment or decr...

Page 11: ...START CURRENT 200A PASSED Y TO CONTINUE The BVA 260 will test the starting system A bar at the bottom of the screen will show the tests progress TESTING STARTING SYSTEM PLEASE WAIT Press the Down key...

Page 12: ...provides the initial information to diagnose and or further test the starting system if necessary Symptomatic Check before Proceeding Check all cables and connections Check the battery for corrosion...

Reviews: