INSTALLATION-MANUAL  

Scissor 

 

 

 ASG-3005 

 

ASG-4005

 

 
 

ISSUED 11-02-04

 

 

 

AUTEC Hefbruggen bv 

storage locations of paint and wax, and 
also rooms where there is a danger of 
explosion. 
 

ELECTRICAL POWER SUPPLY 

POINT. 
The client must ensure that there is a 
power supply point near the installation 
site, which satisfies all the applicable 
legal requirements (see page 4). If such 
power supply is not available, the 
installation technician will arrange  for 
an emergency cable. The lift shall be 
tested after the emergency power 
supply has been dismantled. The client 
must then arrange for a duly qualified 
and recognised installation technician to 
lay the final wiring. 
 

IMPORTANT INSTALLATION 

MEASURES 
The lift must be installed taking into 
account the dimensions of other objects 
(Fig. 4), and the rules and regulations 
applicable in the country where the lift is 
installed.  
In particular, attention should be paid to 
the following : 

„

 

The minimum height from the floor, 
at the installation location, must be 
5000 mm 

„

 

The minimum distance from the 
walls must be 1 m. 

„

 

The minimum working area is 500 
mm 

Industrieterrein IJsselveld, Vlasakker 11, 3417 XT MONTFOORT, The Netherlands 

Tel: +31 348 477000   Fax: +31 348 475104 Internet: www.autec.nl - E-mail: [email protected] 

 

en/TD-ASG-4005-3 

 

„

 

Adequate room for working 

„

 

Adequate room for maintenance, 
access-/ and exit routes. 

„

 

Position with respect to other 
machines 

„

 

In the neighbourhood of the power 
supply point to ensure problem-free 
connection. 

 

 Fig. 

LIGHTING 
All the parts of the lifting lift must be 
uniformly and adequately lighted. 

D

uring the installation work, 

there must be no unauthorised 

persons in the safety zone around 

the lift (Fig. 4). 

 

INSTALLATION OF THE LIFT 
Take the two parts of the lift out of the 
packing case. Seal the hydraulic hoses 
openings with tape in order to prevent 
the contamination of the hoses. To 
move the vehicle loading tracks, one 
must use a lifting vehicle having 
sufficient lifting capacity. Lower the lift 
onto the desired installation location. 

 

 

Fig. 5 

 

 

 
Lift the lifting tracks with the help of a 
crane to a height of around 800 mm and 
place the lift in its interlock. 

 

 Fig. 

 

CONNECTING THE HYDRAULIC 

SYSTEM (see figure 20) 
Put the control cabinet in the selected 
spot. Please keep in mind the minimum 
distance to be maintained with respect 
to other objects. Open the control 

cabinet with the help of a socket 
wrench. The connections to the 
connecting block (Fig. 7) in the control 
panel, and the hydraulic system hoses 
are marked. Connect the hydraulic 
hoses according to the following 
drawing. Thereafter firmly tighten the 
connections. 

 

 

Fig. 7 

 

 

Ref.A 

 

Fig. 8 

 

6. CONNECTING TO THE 

MAINS 

 WARNING 

The following actions must only be 

carried out by duly authorised 

personnel : 
 
First check the following points before 
connecting to the mains: 

Summary of Contents for ASG-3005

Page 1: ...ic INDEX OF CONTENTS PG 1 Introduction 02 2 Packing transport and storage 02 3 Safety specifications 02 4 Description of the lift 02 5 Installation 03 Industrieterrein IJsselveld Vlasakker 11 3417 XT MONTFOORT The Netherlands Tel 31 348 477000 Fax 31 348 475104 Internet www autec nl E mail info autec nl en TD ASG 4005 1 ...

Page 2: ...e terminology used in this manual it is necessary that the person performing the installation work should have specific experience in industrial work service maintenance and repair activities and must also possess the ability to explain the drawings and the descriptions contained in this manual to other people At the same time he must also be aware of the general and specific safety regulations wh...

Page 3: ...ate room for maintenance access and exit routes Position with respect to other machines In the neighbourhood of the power supply point to ensure problem free connection Fig 4 LIGHTING All the parts of the lifting lift must be uniformly and adequately lighted During the installation work there must be no unauthorised persons in the safety zone around the lift Fig 4 INSTALLATION OF THE LIFT Take the...

Page 4: ... 9 CONNECTING THE PNEUMATIC SYSTEM Fig 17 The pneumatic system to which the lift is connected must have a water separator and lubrication system as well as a pressure reduction valve Raise the lift to its highest position Connect the pneumatic hoses to the connecting points in the control cabinet according to figure 17 Now connect the compressed air to the pneumatic valve Check the system for prop...

Page 5: ...f 400 mm the proximity switch detects the cam and the lift will thereby get disconnected Fig 12 SYNCHRONISATION SWITCH FIG 13 The synchronisation switch mounted on the underside of the lift must be installed in such a manner that in the lowest position of the lift it is 1 to 3 mm away from the metal plate see ref 1 Fig 13 1 Fig 13 Monitoring the motion of the lift without load Raise and lower the ...

Page 6: ...or ASG 3005 ASG 4005 ISSUED 11 02 04 AUTEC Hefbruggen bv Industrieterrein IJsselveld Vlasakker 11 3417 XT MONTFOORT The Netherlands Tel 31 348 477000 Fax 31 348 475104 Internet www autec nl E mail info autec nl en TD ASG 4005 6 ...

Page 7: ...cy stop B Lift C Descend 1 D Descend 2 FC 1 Lift limit switch FC 2 Fotocel FC 3 Descend switch FC 4 Synchronisation Fig 15 Industrieterrein IJsselveld Vlasakker 11 3417 XT MONTFOORT The Netherlands Tel 31 348 477000 Fax 31 348 475104 Internet www autec nl E mail info autec nl en TD ASG 4005 7 ...

Page 8: ...hronisationvalve 5 Handpump 6 Overpressure valve 7 Electromotor 8 Hydraulic pump 9 Filter 10 Magnetdescend valve 11 throttle valve 12 Oil tank 13 Non return valve Fig 16 Industrieterrein IJsselveld Vlasakker 11 3417 XT MONTFOORT The Netherlands Tel 31 348 477000 Fax 31 348 475104 Internet www autec nl E mail info autec nl en TD ASG 4005 8 ...

Page 9: ...rpressure connection 2 Airreducerunit optionel 3 Pneumatic magnetvalve 4 Connection 5 Pneumac unlock cilinders Fig 17 Industrieterrein IJsselveld Vlasakker 11 3417 XT MONTFOORT The Netherlands Tel 31 348 477000 Fax 31 348 475104 Internet www autec nl E mail info autec nl en TD ASG 4005 9 ...

Reviews: