AUGIER Energy DIAM 3100 Installation & Maintenance Download Page 24

 

 

6021752 DIAMXXXX CUT OUT rev 1-0.doc 

II-24 

 

II.6 CO-OCEM 

 

II.6.1  DESCRIPTION 

 
DIAM4100 fitted with OCEM cut out. 3 positions of the cut out: Normal, maintenance, loop measurement. 
 
 

II.6.2  OVERVIEW 

 
Positions and functions: 
 

 

 
 
 

 

The switch MA and MB connected to the CCR electronic disable starting of the CCR when cut out is 

removed. 
 
 

Summary of Contents for DIAM 3100

Page 1: ...051 6656 677 ocem ocem com www ocem com VAT Nr IT 031 4821 1208 a division of Energy Technology srl Compliance with standards ICAO Aerodrom design manual part 5 IEC 61822 et 61821 FAA AC 150 5345 10F...

Page 2: ...6021752 DIAMXXXX CUT OUT rev 1 0 doc I 2...

Page 3: ...6021752 DIAMXXXX CUT OUT rev 1 0 doc I 3 RECORD OF CHANGES Rev Pages Description From S N By App Date 1 0 First issue ED ED 31 01 19...

Page 4: ...s or accidents resulting from negligence or lack of due care inadequate supervision or maintenance or erroneous use of the equipment or software Any other causes for which AUGIER shall not be held res...

Page 5: ...and maintenance personnel should familiarise and keep themselves trained with resuscitation techniques found in widely published manuals about first aid instructions ELECTROSTATIC DISCHARGE ESD Elect...

Page 6: ..._____________________ II 16 II 3 1 SERVICE POSITION ________________________________________________________II 16 II 3 1 1 SAFETY POSITION _____________________________________________________II 16 II...

Page 7: ...____________________________________________________ II 25 II 6 4 MA SWITCH _______________________________________________________________ II 25 II 6 5 MB SWITCH _____________________________________...

Page 8: ...reviation Definition A Ampere AC Alternating Current B Brightness CCR Constant Current Regulator DC Direct Current EFD Earth Fault Detector HV High Voltage IT Injection Transformer LFD Lamp Fault Dete...

Page 9: ...6021752 DIAMXXXX CUT OUT rev 1 0 doc I 9...

Page 10: ...The main function is to connect easily the loop to the earth A second function is to measure the impedance loop 6 models CCR code CBA SIMALT Type 1 SIMALT Type 2 SIMALT Type 3 CCR code CSE CCR code CR...

Page 11: ...ERVICE MAINTENANCE or SAFETY MEASUREMENT See Note 1 Note 1 No measurement position for SEB cut cout Standards ICAO Airport design manual part 5 STNA CCTP 91068 rev 93 CENELEC prENV 50231 FAA AC150 534...

Page 12: ...ition vertically the loop s terminals are linked to the output of the CCR II 1 2 1 SAFETY POSITION By removing the two jumpers from the previous operating position as above the CCR will be disconnecte...

Page 13: ...concerning the load This is the measurement position of the cut out plate WARNING Although the CCR and the loop are isolated the CCR can be switched ON In the case where the two jumpers are removed it...

Page 14: ...onal position jumpers In horizontal position II 2 2 SAFETY POSITION By removing the two jumpers from the previous operating position as above the CCR will be disconnected from the loop in a safe and c...

Page 15: ...ev 1 0 doc II 15 II 2 1 LOAD MEASUREMENT POSITION By removing the two jumpers of L1 L2 it is possible to measure the load WARNING The CCR can start in short circuit and voltage can appear on the CCR o...

Page 16: ...position jumpers In horizontal position II 3 1 1 SAFETY POSITION By removing the two jumpers from the previous operating position as above the CCR will be disconnected from the loop in a safe and cle...

Page 17: ...r to allow to proceed at all insulation and continuity measurements which can be carried out as well as any other testing or research operations concerning the load This is the measurement position of...

Page 18: ...interlock contact may be provided in order to shunt down the CCR while manoeuvering the handles or monitor its position II 4 2 SERVICE POSITION It is the operational position The handle is plugged in...

Page 19: ...ided in order to prevent any access to live parts during energised CCR operation while setting the position switch WARNING The loop is NOT CONNECTED TO EARTH If the interlock switch is installed and w...

Page 20: ...N This safety position will allow the operator to work on the load safely the load is in short circuit and grounded The CCR cannot be energised II 5 4 LOAD MEASUREMENT POSITION This measurement positi...

Page 21: ...are accessible in direct way on the front panel without opening the CCR II 5 7 CIMALT MAINTENANCE 1 Remove the 3 fixing screws and tilt the support plate forward to access the back of the switch 2 Che...

Page 22: ...6021752 DIAMXXXX CUT OUT rev 1 0 doc II 22...

Page 23: ...ews and remove the 2nd stage assembly to perform the same check on the first stage of the switch 4 Former equipment THO DIAMANT CCRs and switches mounted on Epoxy plate verification must be done from...

Page 24: ...6 1 DESCRIPTION DIAM4100 fitted with OCEM cut out 3 positions of the cut out Normal maintenance loop measurement II 6 2 OVERVIEW Positions and functions The switch MA and MB connected to the CCR elect...

Page 25: ...n the switch is open Loop measurement position or cut out removed the CCR can t start and the following message appears In french In english In spanish When the switch is closed Normal position mainte...

Page 26: ...low the operator to work on the load safely the load is in short circuit and grounded The CCR output is in short circuit It can be energised The rotative switch may be locked in the safety position II...

Page 27: ...gnation Code SIMALT 1 Cut out earthing plate Jumper 30 09323 30 09325 SIMALT 2 Cut out earthing plate Jumper 30 11851 10 25705 SIMALT 3 Jumper 30 07967 SEB Red handle service handle Green handle 30 11...

Page 28: ...srl Operating office Via della Solidarieta 2 1 40056 Valsamoggia Loc Crespellano BO Italy Ph 39 051 6656 611 Fax 39 051 6656 677 ocem ocem com www ocem com VAT Nr IT 031 4821 1208 a division of Energ...

Reviews: