Figure 12. Controller box ground wire. Green
Procedure
A.
Preparation for installation.
1)
Disconnect the power cord from power outlet. Remove the water tank, portafilter, and drip
tray.
2)
Remove the top cover after removing the screws indicated by the red arrows in Figure 13.
Pull out the top panel.
Figure 13. Top panel. Red arrows indicate the screws that hold the top panel.
B. Install SSR.
1)
Remove the back panel of the machine after removing the two screws indicated in Figure 14a.
Loosen the screw indicated in Figure 14b by several turns (do not remove it). The back panel
can be removed by sliding it back and lifting up.
6