ATS GDS Series Installation, Operation And Maintenance Manual Download Page 12

GDS Series ©2016

12

Maintenance

to prevent breakage.  Make certain that all finger prints are 

wiped clean before reinstalling (see installation of the quartz 

sleeve).  Replace o-ring [ATS8-544(1)] every time a quartz 

sleeve is cleaned or replaced. We reccommend replacing the 

quartz sleeve once a year.

U.V. LAMPS:

INSTALLATION OF THE ULTRAVIOLET LAMPS:

**DO NOT PUT POWER ON AT THIS TIME!**
CAUTION: Never operate or look directly at  U.V. 

lamp outside the disinfection chamber.

Make sure unit is unplugged when installing or servicing 

ultraviolet lamp.  Remove any paper tabs on the U.V. lamp 

and avoid allowing fingerprints and other debris to deposit.  

Carefully place the lamp inside the quartz sleeve leaving 

enough space to connect the socket connector to the lamp 

pins.  Then gently slide the brass dust cap over the end nut, 

securing the lamp and protecting it from dust.

ULTRAVIOLET LAMP MAINTENANCE 

REQUIREMENTS:
The U.V. lamp is rated for 9,000 hours of continuous use. 

After this period of time, the U.V. lamp has undergone a 

photochemical change.  While the lamp will not normally 

be burned out, the lamp quartz may no longer emit the 

254-nm shortwave U.V. to effectively kill bacteria.  Failure

to replace the U.V. lamps every 9,000 hours may cause

bacteriological breakthrough.  Should the use of the

disinfection unit be intermittent, in no case should the

U.V. lamp be used for more than 24 months regardless of

the number of hours of operation due to normal shelf life

degradation of the U.V. bulb.  Changing the quartz sleeve

should be done at the same time U.V. lamp replacement is

scheduled.
It is recommended that your water supply be tested 

periodically (yearly) through your local health department or 

approved certified laboratory.

ELECTRICAL:
The GDS series are furnished with 6’ line cord that will plug 

into a 110V outlet.  Electrical receptacles must be properly 

grounded for safe operation.  Improper grounding will void 

any warranty.
When possible use a separate breaker to minimize voltage 

fluctuations  and  avoid  accidental  shut  off.    After  unit  is 

installed and water is turned on, plug the unit into 110V wall 

receptacle.  View lamp operation through safety sight port 

lens.  

NOTE: Avoid exposing your eyes to U.V. light.

QUARTZ SLEEVE:
Installation of the 

q

uartz 

s

leeve:

Always handle quartz sleeves carefully to prevent breaking 

or chipping.  The quartz sleeves are to be clean and free of 

fingerprints before installing.  
After unplugging the unit, remove the brass dust cap and 

electrical connection at each end. Then remove each brass 

end nut. Install the quartz sleeve through the stainless steel 

threaded nipples with 0.5” sticking out on each end. Use a 

small  amount  of  plumber’s  grease  and  install  the  o-ring 

around  the  quartz  sleeve.  Avoid  riding  the   o-ring  on  any 

threaded part of the nipple.  Hand-tighten each brass end nut 

to form a compression seal around the quartz sleeve.  Avoid 

over

 

tightening the nut, which may cause a fracture on the end 

of the quartz sleeve.  Under normal operation conditions, 

hand-tightening will provide a 100 psi seal.  Do not use any 

devices to tighten end nut.
After you have tightened the brass end nut and all other 

plumbing connections, open the outlet valve.  Slowly open 

the inlet valve and flush out all remaining air.  Then close the 

outlet valve and slowly open the inlet valve fully.  Check the 

unit for leaks.  If you find a leak at a brass end-nut, tighten the 

brass end-nut further.  If the leak continues, drain the unit and 

inspect the quartz o-ring and quartz sleeve for proper seal. 

Once you complete checking the unit, reassemble o-ring and 

tighten brass end-nut.  Repressurize the unit and check again.

REQUIREMENTS FOR CLEANING THE QUARTZ 

SLEEVE:
As water passes through the U.V., minerals, debris and other 

matter in the water may deposit onto the quartz sleeve.  After 

sufficient film has formed on the quartz sleeve, the ability of 

the ultraviolet germicidal rays to pass though the quartz sleeve 

and into the water may be impaired.  Therefore, it is necessary 

to determine a cleaning schedule for the quartz sleeve.  The 

frequency will depend on the specific type of water conditions. 

If the water has been processed through deionization, reverse 

osmosis, or is distilled, cleaning may be required only once per 

year.  If untreated water is used, the cleaning frequency will 

vary.  A minimum of once yearly is standard recommendation 

for cleaning and lamp replacement.  Contact your local dealer 

for scheduling this service.  Your specific situation will vary the 

frequency time according to the water quality of the home or 

facility application. 
QUARTZ SLEEVE CLEANING PROCEDURES:
To  clean  the  quartz  sleeve,  turn  off  the  water  flow to the 

disinfection unit, turn power off, and at a separate faucet or 

valve relieve the water pressure from the UV. Then disconnect 

the electrical service to the lamp pins.  Carefully remove the 

U.V. lamp.  Loosen the end nut with o-ring and remove the

quartz sleeve.  The quartz sleeve may then be washed with a

mild soap and hot water solution and rinsed clean with hot

water.  Should this be insufficient to clean the quartz sleeve,

a mild acid may be used (i.e. vinegar).  Be certain to follow

all recommended safety and handling procedures on the acid

container.  It is important to handle the quartz sleeve with care

GDS ©2019 • www.aquat.com

Summary of Contents for GDS Series

Page 1: ...tallation Operation and Maintenance Manual CAUTION Read and Follow all safety rules and operating instructions before first use of product Ultraviolet Disinfection Systems MODELS GDS 7 GDS 15 Dealer I...

Page 2: ...GDS Series 2016 2...

Page 3: ...lation 6 Installation Diagram 7 Electronic Controls Startup Procedures 8 Sanitation Procedures 10 Maintenance 12 Unit Parts Breakdown 13 Circuit Board Layout 15 Wiring Diagram 16 Troubleshooting 17 St...

Page 4: ...manufacturer distributor may cause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this disinfection system...

Page 5: ...bracket is secured to the wall and the chamber is held in place by tightening the lock nut to both mounting bracket and chamber The function of this ultraviolet disinfection unit is to provide in exc...

Page 6: ...rtz sleeve and lamp replacement Four 4 anchor bolt holes are provided for proper wall support Use anchors with screws for sufficient support not included If your piping system is subject to impulse pr...

Page 7: ...GDS Series 2016 7 Installation Diagram Recommendation Use a 20 micron prefilter to reduce turbidity and for easy sanitation GDS 2019 www aquat com...

Page 8: ...al status This is also equipped with an internal and external fused surge protection system This solid state electronic circuit board provides the latest in UV lamp monitoring technology U V LAMP CONT...

Page 9: ...GDS Series 2016 9 Sample Screen Shots Fig 1 Fig 2 Fig 3 Fig 4 GDS 2019 www aquat com...

Page 10: ...Water in the well and storage tank should be treated with a strong chlorine solution to destroy disease organisms All pipelines and fixtures in the distribution system should be rinsed and flushed wit...

Page 11: ...and disinfect the water if necessary Plumbing Line Sanitation Only When installing an ultraviolet disinfection system a prefilter with sump may serve as a source to sanitize the water lines only For w...

Page 12: ...he quartz sleeve through the stainless steel threaded nipples with 0 5 sticking out on each end Use a small amount of plumber s grease and install the o ring around the quartz sleeve Avoid riding the...

Page 13: ...ING IS THE SOLE PROPERTY OF AQUA TREATMENT SERVICES ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF AQUA TREATMENT SERVICES IS PROHIBITED 2 4 16 A GDS 7 CUSTOMER MANUAL 16 8 1...

Page 14: ...OPERTY OF AQUA TREATMENT SERVICES ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF AQUA TREATMENT SERVICES IS PROHIBITED N INCHES MAL 010 IMAL 002 SE SPECIFIED 2 2 16 A GDS 15...

Page 15: ...GDS Series 2016 15 Circuit Board Layout GDS 2019 www aquat com...

Page 16: ...GDS Series 2016 16 Wiring Diagram ATS 281P CIRCUIT BOARD UV LAMP ATS1 421 GDS BALLAST ATS 4000 PLUG GDS 2019 www aquat com...

Page 17: ...nstall a voltage regulator Check replace Replace Lamp Check output voltage Replace ballast Trace out and repair Leak at quartz nipple Defective or cracked o ring Replace o ring O Ring not seated prope...

Page 18: ...3 Open the sterile bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid oral contamination of the s...

Page 19: ...GDS Series 2016 19 GDS 7 15 Specifications GDS 2019 www aquat com...

Page 20: ...GDS Series 2016 20 Warranty GDS 2019 www aquat com...

Reviews: