4. Hardware Installation 

Step1: Connect to Power 

 Prepare suitable DC 9~30V power source and connected to EH switch by 3-pin 

Terminal blocks. 

 You can connected two DC input for power auto-backup need. 

 Check P1/P2 LED for correct power source, everything is OK if the LED(s) was 

lighted 

Step2: Connect to Network Device by Ethernet 

 Connected your device by standard UTP/STP cable with RJ-45 connectors to EH 

switch. 

 The LINK LED will be lighted if the Ethernet connection was linked. 

 It is indicated and blinked if data was transfer by EH switch hub. 

 

UL Notice for Power supplier 

All the series of EH products are intended to be supplied by a Listed Power Unit 
marked with ¡LPS¡, ¡Limited Power Source¡ or ¡Class 2¡ and output rate 9-30VDC, 
0.6A. Or, use the recommended power supply in ¡Optional Accessories. 

 

5. LED Indicators 

There are four LED indicators located at the front panel of EH series.       

Name 

LED 

Status 

Description 

Off 

Both P1 and P2 on or off 

ALM 

Green 

On 

Either P1 or P2 on 

Off 

Power input 1/2 is not plugged yet 

P1/P2  Green 

On 

Power status is Ready 

Off 

Link is Boren or Cable not be plugged 

Green 

Blink 

Traffic be indicted for data transfer 

Off 

10M rate be active 

RJ45 

Yellow 

On 

100M rate be active 

Off 

No data be transmitted 

Data 

Blink 

Working when data transmitted 

Off 

No media be available 

Fiber 
SC/ST 

Link 

On 

Working when media was ready 

 

7. Configuration and Setting Methods 

Any settings or configurations are unnecessary. 