33
Picture 30 - GRID line connection
Label the cables of the GRID line and EPS line.
Sheathe the cables and pass them through a slot located on the back of the structure (Picture 31).
Picture 31
–
Slots of Grid and EPS cables
1.:OFF
2.:CHECK THAT
VGRID = 0 V
Slots of Grid and EPS cables –
Complete with cable glands