background image

 

 

2

 / 

4

 

 

2.The signal lines 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

3.After the wire connecting the motor to the controller is completed. 
 
Power is connected to the controller's B+ (24V+,48V+,72V+…),B- pile(0V). 

1. No. 1 (PWR) of the controller harness is connected to B+, connected with  the on/off switch, and controlled 

start up. 

Reviews: