2
/
4
2.The signal lines
3.After the wire connecting the motor to the controller is completed.
Power is connected to the controller's B+ (24V+,48V+,72V+…),B- pile(0V).
1. No. 1 (PWR) of the controller harness is connected to B+, connected with the on/off switch, and controlled
start up.