2-5
SECTION II: PREVENTIVE MAINTE-
NANCE CHECKS AND SERVICES (PMCS)
2-3 PuRPOSE OF PMCS
PMCS is performed daily when the PVS-7 is in use to ensure that
the sight is ready at all times. Procedures are a systematic inspec-
tion of the goggle that will enable you to discover defects that might
cause the PVS-7 to fail on a mission.
2-4 FREquENCY OF PERFORMING PMCS
The frequency of PMCS performing PMCS is follows:
A. Daily when the PVS-7 is in use.
B. weekly when in a standby condition.
C. Semi-annually when stored in depot or administrative stow-
age.
2-5 PERFORMANCE OF PMCS
Preventive maintenance checks and services shall be performed
following the sequence and inspection procedures indicated in
Table 2-2
Table 2-2. Preventive Maintenance Checks and Services
B = Before Operation; D = During Operation; A = After Operation
INTERVAL &
SEQUENCE NO
.
ITEM TO BE INSPECTED/
PROCEDURE
B
D
A
1
GOGGLE - Check for completeness, includ-
ing accessories. Check for dirt and moisture
on external surfaces and parts. Clean and dry
with lint-free cloth.
2
SHIPPING CASE - Check for dirt, moisture
and mildew. Clean with mild detergent and wa-
ter. Dry with lint-free cloth.
Summary of Contents for PVS7-HPT
Page 8: ...iii...
Page 9: ...1 1 chapter 1 introduction...
Page 14: ...1 6 Figure 1 1 PVS 7 Components 1 2 5 4 6 8 9 14 10 11 3 13 12 15 16 18 17...
Page 22: ...1 14...
Page 23: ...2 1 chapter 2 operating instructions...
Page 53: ...3 1 chapter 3 maintenance instructions...
Page 62: ...INFO 2 For note...
Page 63: ...INFO 3...