
- 55 -
Before starting, open the air outlet valve(s) (AOV)
and push circuit breaker button (F1) once (open hood
first). Circuit breaker button should now be in
position B.
STARTING PROCEDURE (WITHOUT COLD START)
Reference Name
P1
Digital hour meter
F1
Circuit breaker button
PG
Working pressure gauge
H1
Temperature alarm lamp (red)
H2
General alarm lamp (red)
S1
Start switch
S4
Lamp test button
(P1)
(PG)
(H1)
(H2)
(S1)
(S4)
(F1)
The control panel indicates receiver
pressure (PG) and accumulated
operating hours (P1).
The circuit breaker button is a
protection against unintended starting
of the compressor.
A
B
(F1)