13
TEX 140PS 150PE 180PS 190PE 220PS 230PE 270PS 280PE
© 2007 Atlas Copco Construction Tools AB
|
No. 9800 0800 01
|
2007-10-01
Overhaul instructions
Tool chuck
1
30
tons
2
A
The lock wire (A) will be sheared off in two halves.
Clear the inside of the cylinder from the remaining
half of the lock wire.
Assembly
Before re-assembly do the following:
Properly clean all parts of the machine.
Oil all parts of the machine.
Replace all O-rings.
Replace all worn or damaged parts.
Tool chuck
Rotation of tool chuck
ISO
point to flat
US
flat to flat
Ź
Ź
Ź
Ź