background image

Any revisions must first be approved by the product designer.  Version: 201710 

Revision By: TD 

13.

 

CRITICAL SEAL 

Remove dust and dirt first. Seal the connection 
between the glass receiver channel and the base 
glazing channel 
with clear 
silicon, prior to 
the installation 
of panel 

21 B. 

 
 
 

14.

 

INSTALLATION OF 
FIXED PANEL 

Locate the glass 
panel into the glazing 
channel. Add or 
remove packers in 
the base glazing 
channel as necessary.  
 
 
 

15.

 

ADJUSTING 
BLOCK 

Apply the plastic 
grommets into the 
holes in the glass 
panel 

HZ-F.

 

Assemble retainer 
plate as shown. 
 
 

16.

 

SILL INFILL 

Trim Sill Infill to suit. Apply a continuous bead of 
clear silicon to each inside face of the base 
channel. Ensure the ends of the Sill Infill are 
sealed and place into the base channel in the 
location as shown. 

 

17.

 

FASTENING GLASS 

Secure the glass panel into the receiver channel 
by tightening hex screws firmly with hex key 
supplied. 

(Do not overtighten).  

 

18.

 

ADJUSTING BLOCK COVERS 

Apply clear silicon to the heads of the screws 
and place the cover plate over the end retainer 
plate. Tape in place for 24 hours. 

 
 
 
 
 
 
 
 
 

19.

 

SILICON APPLICATION 

Using the blue tape supplied, mask the glazing 
channel and glass at the intersections as shown. 
Apply clear silicon to the inside and outside of 
the glass panel. Use the spatula provided to 
remove provided to remove the excess silicon. 
Remove the masking tape immediately after 
application.  

 

 
 

20.

 

BUMPER APPLICATION 

Apply 15mm area of primer to wall tiles in 
locations as shown by the dark dots. Place 
bumpers onto 
primer. Ensure 
the door slides 
to, and meets 
the centre of the 
bumpers. 
Alternatively use 
vertical seal 
supplied.  

 
 
 

 

 

Summary of Contents for SL3F

Page 1: ...th 2 large holes SL B 1 x 2 5mm Hex Key 1 x Plain Fixed Panel 21 B 1 x 4mm Drill Bit 1 x Handle Set SL 8 x Long Screws sq drive 1 x Roller Set 8 x Wall Plugs 2 x End Connector Channels and Spacers 1 x...

Page 2: ...icon used must be compatible with anodised aluminium as well as the waterproofing being used 4 Ensure the glass receiver channel is located firmly over the base glazing channel The machine recess in t...

Page 3: ...th the short CSK screws 9 HANDLE INSTALLATION Assemble handles as shown Use the 3mm Hex Key supplied with handle set 10 ROLLER SET ASSEMBLY TO GLASS DOOR Ensure the direction of the door is correct Fi...

Page 4: ...sealed and place into the base channel in the location as shown 17 FASTENING GLASS Secure the glass panel into the receiver channel by tightening hex screws firmly with hex key supplied Do not overtig...

Page 5: ...atible with anodised aluminium as well as the waterproofing being used 4 Ensure the glass receiver channels are located firmly over the base glazing channel The machine recess in the wall glazing chan...

Page 6: ...rovided in end connector channel Fix with the short CSK screws 9 PREPARATION FOR GLASS INSTALLATION Apply 6mm plastic packers into base glazing channels in locations as shown 10 CRITICAL SEAL Remove d...

Page 7: ...rst Seal the connection between the glass receiver channel and the base glazing channel with clear silicon prior to the installation of panel 21 B Locate the glass panel 21 B into the glazing channel...

Page 8: ...ion 201710 Revision By TD 21 BUMPER APPLICATION Apply 15mm area of primer to wall tiles in locations as shown by the dark dots Place bumpers onto primer Ensure the door slides to and meets the centre...

Reviews: