background image

Any revisions must first be approved by the product designer. Version: 201909          Revision by: JST 

9.

 

CRITICAL SEAL 

Remove dust and dirt first. Seal the connection 
between the glass receiver channel and the base 
glazing channel with clear silicon prior to the 
installation of panel 

20 B. 

Ensure the corner junction between wall 
channel 
and 

base channel 
is full of 
silicon before 
final glass                            
placement. It 
is vital that all 
junctions are 
sealed 
sufficiently.  
Prior to installation of glass panels and infill.  Use 
the clear silicon supplied. 
 

10.

 

INSTALLATION OF FIXED PANEL 

 
Locate the glass panel 

20MG-F 

into the glazing 

channel. Add or remove plastic packers (

BAG11

)  

in the base 
glazing 
channel as 
necessary.  
This panel 
must protrude 
23mm above 
the wall 
channel. 
 

11.

 

INSTALLATION OF THE RETURN PANEL.

 

Locate the glass panel 

20 B 

into the glazing 

channel.   Adjust height of panel if necessary by 
adding or removing plastic packers (bag11) in 
the base glazing channels.  

 

12.

 

GLASS DOOR / TOP TRACK ASSEMBLY 

 

Before proceeding check the length of the 
supplied top track is correct.  The top track 
should fit between the wall and 

20 B 

glass return 

panel and be the same measurement top and 
bottom. 
 
 

The next processes are easily achieved when the 
door is laying flat on clean saw horses.  
Alternatively use clean 50mm timber blocks on 
the floor.  
 

HANGER ASSEMBLY  

 The bolts on the 
hangers must be 
facing inside the 
shower.  Ensure the 
direction of the door 
is correct.  Fit 2x 
hangers to the door 
(note clear gaskets fit 
1x inside, 1x outside). 

 
 

 
 
 
 
 
 
 

13.

 

SOFT CLOSE ASSEMBLY TO HANGER SET

 

Fit the idle roller and soft close mechanism to 
the hangers using 4mm hex key.  The red striker 
must face upwards.    

 
When the idle rollers are being fitted to hangers 
apply a 5mm drop of clear silicone inside the 
thread.  This will ensure that the hanger does 
not move out of adjustment.

 

 

 
 
 

Summary of Contents for miGLIDE MG2-LARGE

Page 1: ...tor bracket Phillips Screwdriver 1x Bag 1 Allen Keys 3 4 1x Bag11 Packers 1x Blue Masking Tape 1x BAG GB G sliding door guide blocks 1 x Clear Silicon 1 x BAG MG SCREWS 8x6 x10CSK screws 2x6 x40CSK sc...

Page 2: ...efect must be visible to the naked eye in normal daylight conditions standing at a distance of two meters Any imperfection that is not visible within the above noted parameters will not be accepted by...

Page 3: ...nels Use a straight edge and mark the wall to indicate where the wall channel is plumb 5 Apply a silicon bead to the full length of channels Silicon used must be compatible with anodised aluminium as...

Page 4: ...B into the glazing channel Adjust height of panel if necessary by adding or removing plastic packers bag11 in the base glazing channels 12 GLASS DOOR TOP TRACK ASSEMBLY Before proceeding check the le...

Page 5: ...Fix MG 3W end connector bracket flush with the end of the top track using 4x 6 x10CSK screws Fixed Panel this end 16 END CONNECTOR ANGLE MG 2W Fix the MG 2W end connector angle into place Screws shou...

Page 6: ...e the door as far back in an open position as possible Slip the sliding guide block under the door and locate it in line with the end of the fixed panel on the opening side Apply a small bead of silic...

Page 7: ...ired colour finish Install into the recess into the top track Sand the reverse face of the acrylic to allow for adhesion Apply 2 x 3mm beads of silicone to front face of top track Place the detail str...

Page 8: ...R Z FLASHING When a 2mm Acrylic Wall liner has been supplied the aluminium Z Flashing will need to be trimmed Using a hacksaw trim the inside angle of the Z flashing as shown The Z flashing must sit f...

Page 9: ...E ABS LQ GB LONG Linea Quattro Installed on base prior to tiling Black Pearl Installed onto acrylic base when installing screens CODE ABS LQ GB SHORT Linea Quattro Installed after tiling or on an Arch...

Reviews: