background image

2

Copyright © ATL Transformers Ltd  2019

  Doc Ref TECH148     Issue 1

CONTENTS

1.

2.

3.

4.

1.1 SAFETY NOTES ...................................................................................................... 

4

3.1 MOUNTING WITHIN APPARATUS HOUSING..................................................... 

8

2.1 KEY PSP/ASP ECO-RAIL® FEATURES .................................................................. 

6

4.1 ROUTINE MAINTENANCE .................................................................................. 

10

3.3 VOLTAGE ADJUSTMENT ...................................................................................... 

9

4.3 MAINTENANCE AFTER FLOODING ................................................................... 

11

1.2 PURPOSE ............................................................................................................... 

5

3.2 CABLE CONNECTION ........................................................................................... 

9

2.2 PRODUCT OPERATION ........................................................................................ 

7

4.2 TESTING IN SERVICE .......................................................................................... 

10

4.4 SPARE PARTS ...................................................................................................... 

11

INTRODUCTION

PRODUCT INSTALLATION

PRODUCT DESCRIPTION

PRODUCT MAINTENANCE

5.

TRAINING & COMPETENCE ..................................................................................... 

11

TRAINING & COMPETENCE

6.

6.1 DATA SHEET REFERENCE .................................................................................. 

10

6.3 DECLRATION OF CONFORMITY ........................................................................ 

12

6.2 NR COMPONENT APPROVALS .......................................................................... 

11

PRODUCT MAINTENANCE

7.

MANUFACTURER CONTACTS .................................................................................. 

12

MANUFACTURER CONTACTS

1.3 GUARANTEE .......................................................................................................... 

5

Summary of Contents for T2914

Page 1: ...O M MANUAL Class I PSP ASP Transformer 3ph 400 650V Lightweight Aluminium Range English Francais atl TRANSFORMERS Copyright ATL Transformers Ltd 2019 Doc Ref TECH148 Issue 1...

Page 2: ...MAINTENANCE AFTER FLOODING 11 1 2 PURPOSE 5 3 2 CABLE CONNECTION 9 2 2 PRODUCT OPERATION 7 4 2 TESTING IN SERVICE 10 4 4 SPARE PARTS 11 INTRODUCTION PRODUCT INSTALLATION PRODUCT DESCRIPTION PRODUCT MA...

Page 3: ...Y ASKED QUESTIONS 14 15 FREQUENTLY ASKED QUESTIONS 10 PRODUCT WARRANTY 15 PRODUCT WARRANTY 11 END OF LIFE DISPOSAL 15 END OF LIFE DISPOSAL 12 ECORAIL PSP ASP TRANSFORMER RANGE APENDIX B LABEL DETAILS...

Page 4: ...sonnel who are aware of the dangers involved and after all necessary precautions have been taken WORKING PRACTICES Unauthorized interruption of the system may endanger the safe operation of the railwa...

Page 5: ...approved Principal Supply Point 1 3 GUARANTEE The function and safety of the equipment is only guaranteed if the warning and safety instructions included in this manual are adhered to ATL Transformers...

Page 6: ...ngress protection level of IP32 and is suitable for indoor Railway Installations Primary Secondary Class I terminals are segregated within separate terminals on the transformer The Transformer feature...

Page 7: ...ternally to the screw clamp terminals provided Conduit should meet the requirements of NR L2 SIGELP 27410 Issue 2 NR L2 SIGELP 27421 27422 On class I models an earth terminal is provided and shall alw...

Page 8: ...ise the safety integrity of the unit In the event that the paint finish is damaged during installation a touch up pen is available for aesthetics however paint is supplementary to the base material an...

Page 9: ...tage with a calibrated DVM to check your distribution is within tolerance 4 6 Connect Supply cables to the provided Input Voltage terminals ensuring they are routed through suitable conduit and secure...

Page 10: ...mmeter check the load current Relevant safety checks testing should be conducted in addition to these checks in line with Network Rails controlled safety inspection procedures prior to energizing the...

Page 11: ...The transformers are to be installed within a Network Rail approved Structure by trained authorized Network Rail installers only All maintenance activities shall be undertaken by trained and authoriz...

Page 12: ...tomer Standards Specifications BS EN 61558 1 2009 Safety of power transformers power supplies reactors and similar products NR L2 SIGELP 30007 Issue3 Product Specifi cation for Power Transformers for...

Page 13: ...power transformers power supplies reactors and similar products BS EN 62262 Degrees of protection provided by enclosures for electrical equipment against mechanical impacts IK code NR L1 ELP 27000 Ass...

Page 14: ...errules are not being used cables should be stripped 10mm and secured into the terminals The recommended torque setting is between 9 FREQUENTLY ASKED QUESTIONS The cables are connected on the terminal...

Page 15: ...is 12 months Product warranty document is available upon request 10 PRODUCT WARRANTY All Electrical equipment must be disposed of in accordance with the Wee Directive 2002 96 EG End of life or comple...

Page 16: ...rmer Product Range Continued Part No Description Catalogue No T2963 CLASS I ASP PSP LIGHTWEIGHT TRANSFORMER 60 000VA N A T3027 1 CLASS I ASP PSP LIGHTWEIGHT TRANSFORMER 80 000VA N A T3143 CLASS I ASP...

Page 17: ...100 260 115 16 295 30KVA 760 500 1100 260 115 16 310 40KVA 760 500 1100 320 260 16 340 50KVA 920 500 1200 260 115 16 450 60KVA 920 500 1200 260 115 16 500 80KVA 920 500 1200 260 115 16 690 120KVA 920...

Page 18: ...ss Frequency Impedance Weight IP Rating Efficiency Date Elec Spec 1000 100 xxxxx 01 04 2013 DATE INITIALS TESTED LABEL 1 LABEL 2 LABEL 3 LABEL 4 LABEL 5 LABEL 6 Label Description Location 1 Electrical...

Page 19: ...mer Generic Wiring Diagram c b A2 A3 A4 A5 A6 A7 A8 B2 B3 B4 B5 B6 B7 B8 C2 C3 C4 C5 C6 C7 C8 a b c yn a B C yn a c b 2 2 2 2 2 A2 Dd0 Delta Delta Aluminium Aluminium Dd0 Delta Delta 3ph Step Up Trans...

Page 20: ...anson Close Middleton Manchester M24 2HD Tel 44 0 161 653 0902 Fax 44 0 161 653 4744 sales atltransformers co uk www atltransformers co uk atl TRANSFORMERS Single Phase Transformers Three Phase Transf...

Reviews: