Drawing
2.5
Fixing
General and local regulations must be observed. Therefore, these steps should only be
carried out by a trained professional.
The machine must be set up and fixed on sufficiently firm ground, if necessary, according to the minimum
requirements of the information given in the foundation plan.
The machine must be fastened at the points provided with suitable or specified fastening material.
In addition to the ground conditions, the guidelines and instructions of the accident prevention regulations
as well as the workplace regulations must be observed when selecting an installation site.
When assembling on floor coverings, check their load-bearing capacity. A construction expert should be
consulted for inspection when mounting on floor coverings.
Summary of Contents for W22
Page 3: ...BEDIENUNGSANLEITUNG ATH W22 ...
Page 55: ...OPERATING INSTRUCTIONS ATH W22 ...
Page 107: ...MANUEL D UTILISATION ATH W22 ...
Page 159: ...NÁVOD K OBSLUZE ATH W22 ...
Page 211: ...MANUAL DE INSTRUCCIONES ATH W22 ...
Page 263: ...BEDIENINGSHANDLEIDING ATH W22 ...
Page 315: ...INSTRUKCJA OBŁSUGI ATH W22 ...
Page 367: ...NÁVOD NA OBSLUHU ATH W22 ...