detectors   must   be   protected   against   mechanical   impacts   (e.g.   by   application   of   the   WM3
mounting bracket, see details in Section 12),
location of detectors must enable scheduled inspection and adjustments of equipment as well as

replacement or disconnection of a detector. 

9.2.2

Electric network

Power supplying network for gas detectors must be designed and installed exclusively by persons with
adequate competences or acting in coordination and under supervision of the equipment manufacturer.

The electric power supplying system must be installed in line with the engineering documentation.

The electric network for power supply of detectors must be installed in line with general rules for

design and deployment of I&C

2

 systems. Cables and conductors must be secured against damage.

Routing of cables in cable trays is recommended.

All jobs associated with connection of detectors and other components of a gas safety

system must be carried out with power voltage isolated from the control unit. Be aware that
another   collaborating   system   (e.g.   a   ventilation   system   controlled   by   common   contact

outputs of relays) can still deliver hazardous voltage, despite the power voltage for the gas
detection system is off.

All interconnections within the system must be made with three-core cables, for instance the

following   cable   types   are   recommended:   YTKS,   OMY   and   LiYY   (for   the   communication   bus).
Detectors   Alpa EcoDet XT   must   be   connected   by   means   of   a   four-core   cable.   Selection   of

appropriate cables is within the responsibility scope of the system designer with consideration of
local conditions at the installation site of the Gas Safety System. Maximum lengths of cable

sections for connections between detectors and a control unit for specific cross-sections of cable
cores are listed in Appendix [4].
For proper selection of cable type take account of voltage drops down interconnecting lines.

Power supply lines for detectors must be designed in such a way that the actual voltage
across the detector terminal must never drop below the minimum permissible level, even

under the most unfavourable power supply conditions with the minimum expected limit of
power supply voltage at the line input (see Section 10).

Springy   contacts   of   terminal   blocks   are   released   after   depressing   the   contact   button   with
a screwdriver. 
Detectors can be mounted with the use of mounting holes that are accessible after opening of the

detector   enclosure   so   that   the   gas   inlet   faces   down.   Dimensions   of   enclosures,   spacing   of
mounting holes and layout of components inside the detector are shown in Figure 2. D A drilling

template attached to the detector enclosure is recommended for drilling boreholes in walls and
other support structures. 

If multi-core strands (commonly referred to as "cables") are used for connection, the ends of these strands

must be secured with terminal ferrules and lugs.
When two or more conductors are to be connected to a single terminal of the device all these conductors
must be clamped beforehand into a common ferrule with a lug (see details in Table 6).

2

Instrumentation and Control 

s. 17|25

User Manual: POD-043-ENG R03

Summary of Contents for Alpa EcoDet XT

Page 1: ...POD 043 ENG R03 User Manual Gas Detector Alpa EcoDet XT Product code PW 098 LPG...

Page 2: ...ring Detection and Reduction of gas hazards We invite you to familiarize yourself with our offer on www atestgaz pl Atest Gaz A M Pachole sp j ul Spokojna 3 44 109 Gliwice Poland tel 48 32 238 87 94 f...

Page 3: ...ices in not allowed Engineering of a gas safety system for any specific facilities to be safeguarded may need consideration of other requirements during the entire lifetime of the product Use of unaut...

Page 4: ...XT Gas Detector 6 Table 2 Electric interface description 9 Table 3 Indication of operation modes 10 Table 4 Settings of the configuration switch 13 Table 5 Possible reasons for indication of intercon...

Page 5: ...replacement of the MniPel Head reduction of the calibration time three alarm thresholds indication of detector failures or interruption of the monitoring loop long term operation with steady parameter...

Page 6: ...icate Operation of a gas detector consists in continuous measurements of gas concentration within the detector vicinity as well as periodic tests of the gas sensor Results of the foregoing operations...

Page 7: ...ng measures should be undertaken evacuate all third persons from the endangered area if possible enable ventilation of endangered confined areas open windows and or doors when a control system that au...

Page 8: ...ion Safety System off there is a possibility that a dangerous voltage can exist on the terminals of the Control Unit It can originate from another system like for an example ventilation system that us...

Page 9: ...4 1 Electric interfaces The appearance of the terminal strip is shown in Figure 2 Port name Pin Description X1 Port of the detector bus Alpa EcoWent XT Gas Detector T connector XT control unit Paramet...

Page 10: ...LED ALARM blinks once per period The 1st warning threshold is exceeded Red LED ALARM blinks twice per period The 2nd warning threshold is exceeded Red LED ALARM is permanently on The alarm threshold i...

Page 11: ...it into a star shaped system The detailed schematic diagram for such a layout is provided in Appendix 3 6 2 Bus layout with an open alarm loop Such a layout assumes that gas detectors are arranged in...

Page 12: ...TEST LOOP port of the control unit which facilitates scheduled tests of the system operability Figure 6 Connection with the Alpa MOD LED1 Control Unit into a closed bus system The detailed schematic...

Page 13: ...communication loop and for nearly all detectors except for the last one deployed down an open loop communication line System layout Detector location Setting for the configuration switch Bus layout wi...

Page 14: ...aboration with Alpa EcoWent XT detectors Figure 9 Collaboration with Alpa EcoWent XT detectors s 14 25 User Manual POD 043 ENG R03 Line up detector Last detector Subsequent line up detectors or a cont...

Page 15: ...s with interconnections within the system see Section 5 guidelines summarized in Table 5 may be helpful to find a remedy for the failure LED indicator Further conditions Possible reason for the proble...

Page 16: ...rs must be established by a designer of a gas safety system with consideration of the following issues LPG detectors should be installed in such a way that the distance between the measuring head and...

Page 17: ...e cable Selection of appropriate cables is within the responsibility scope of the system designer with consideration of local conditions at the installation site of the Gas Safety System Maximum lengt...

Page 18: ...e Bare wires or wires surplus may lead to a hazard of electric shock or equipment damage All cable cores must be terminated inside the device Leaving of unterminated cores is not allowed Incorrect rou...

Page 19: ...the input port of the first detector to an interconnecting cable leading to a control unit Set the configuration switch of the detector to the OST position the last detector in a chain see Figure 11 C...

Page 20: ...nother during the time period of one minute warm up and stabilization of the detector Upon expiration of that time period the OK indicator on the detector front panel should go on If the control unit...

Page 21: ...test gas tripping of the last the most distant detector with a hazardous gas and verification of the control unit behaviour as well as behaviour of all intermediate line up detectors they should indi...

Page 22: ...out on regular basis Such inspections and maintenance must be carried out by trained personnel in line with the applicable state of the art general safety rules and special conditions for installatio...

Page 23: ...heduled inspections are recommended after each three months of the device operation The inspection scope should include visual inspection of the system and its components as well as operability tests...

Page 24: ...equipment can also be returned to the manufacturer 10 Technical specification Power voltage VCC ICC 10 42 V 130 mA Environment In operation Storage Ambient temperatures Humidity Pressure 20 50O C 10 9...

Page 25: ...cription PW 049 CB3 Service cable CB3 PW 064 WM1 Mounting bracket WM1 for wall mounting PW 064 WM3 Mounting bracket WM3 for wall mounting with cover PW 092 B Calibration kit Standardized reference gas...

Page 26: ...5 in relation to directive 2011 65 EU on the restriction of the use of certain hazardous substances in electrical and electronic equipment EN IEC 63000 2018 This declaration of conformity is issued un...

Page 27: ...and a resultant change in its resistance Whereas combustion is not possible on the passive element therefore its properties do not change under the influence of a combustible substance This allows th...

Page 28: ...of such a situation on the detector operation Catalytic sensor working properly at an oxygen concentration of about 21 3 1 1 Impact of the presence of a working gas or other reaction gas Catalytic sen...

Page 29: ...nitrogen or carbon dioxide then the catalytic detector can give a low or even zero response A similar effect can occur when large amounts of reaction gas are released to the atmosphere creating a con...

Page 30: ...pparent reading of the presence of a combustible substance 4 Factors shortening the lifetime of the sensor 4 1 Poison and inhibitors For every reaction with the presence of a catalyst that cause perma...

Page 31: ...correct positions The jumper in the terminal block X2 of the Alpa EcoWent XT must be installed when the detector is not directly coupled with the Alpa EcoDet XT detector Recheck position of the config...

Page 32: ...ion to the position of an internal configuration switch the last detector in the loop or a transient detector Atest Gaz A M Pachole sp j ul Spokojna 3 44 109 Gliwice Poland VAT No PL 9691433231 tel 48...

Page 33: ...ent XT must be installed when the detector is not directly coupled with the Alpa EcoDet XT detector Recheck position of the configuration switch a transient of a line end detector Atest Gaz A M Pachol...

Page 34: ...Went XT must be installed when the detector is not directly coupled with the Alpa EcoDet XT detector Recheck position of the configuration switch a transient of a line end detector Atest Gaz A M Pacho...

Page 35: ...he terminal block X2 of the Alpa EcoWent XT must be installed when the detector is not directly coupled with the Alpa EcoDet XT detector Recheck position of the configuration switch a transient of a l...

Page 36: ...163 553 14 206 656 16 206 566 13 1 63 723 23 75 615 19 96 726 22 109 619 18 131 731 21 146 626 17 168 738 20 186 636 16 207 747 19 229 649 15 1 5 62 872 28 81 741 23 94 874 27 115 745 22 128 878 26 1...

Page 37: ...5 12 107 463 13 89 389 11 144 474 12 126 396 10 184 484 11 169 409 9 229 499 10 218 428 8 1 5 45 555 18 42 462 15 77 557 17 74 464 14 111 561 16 109 469 13 146 566 15 146 476 12 184 574 14 187 487 11...

Page 38: ...9 6 243 337 4 1 58 369 11 56 305 9 93 373 10 93 311 8 133 382 9 135 322 7 177 395 8 185 341 6 229 416 7 249 374 5 1 5 78 451 13 62 373 11 114 456 12 98 378 10 153 464 11 138 387 9 197 477 10 183 432 8...

Page 39: ...1 63 933 30 67 787 25 96 936 29 101 791 24 130 940 28 136 796 23 164 944 27 172 802 22 202 952 26 212 812 21 1 5 50 1130 36 55 955 31 82 1132 35 87 957 30 115 1135 34 120 960 29 149 1139 33 155 965 2...

Page 40: ...64 574 18 55 475 15 97 577 17 89 479 14 132 582 16 124 484 13 169 589 15 163 493 12 209 599 14 207 507 11 1 5 67 697 22 68 578 18 99 699 21 101 581 17 133 703 20 137 587 16 169 709 19 174 594 15 207 7...

Page 41: ...59 494 15 71 413 12 94 498 14 108 419 11 131 504 13 149 429 10 172 514 12 197 446 9 217 528 11 252 490 8 1 5 40 599 19 66 501 15 75 603 18 101 505 14 108 605 17 139 512 13 144 610 16 181 523 12 184 6...

Page 42: ...at the end of the line One Alpa EcoDet XT Gas Detector at the end of the line L2 m L2 m 0 75 1400 1400 1 1400 1400 1 5 1400 1400 2 5 1400 1400 Table 7 Maximum length of cables star configuration Ates...

Page 43: ...rocess e g weather conditions safety potential hazard generated by the mixture criterion B These both criteria have an impact on the final cost of the calibration services and level of competence requ...

Page 44: ...of flammable components 60 LEL concentration of toxic components NDSCh2 oxygen concentration 25 vol tank 3 dm3 water capacity and p 70 atm specified liquid chemical compounds e g glycerol 1 2 propaned...