background image

AD-WM-9080 Page 4 of 4

Display Tilt

Display Rotation/Level Correction

No portion of this document or any artwork contained herein should be reproduced in any way without 
the express written consent of Atdec Pty Ltd. Due to continuing product development, the manufacturer 
reserves the right to alter specifications without notice. ©

20220112

MAINTENANCE

ADJUSTMENTS

CABLE MANAGEMENT

B5. Secure the Display

• 

Tighten fasteners and check if the mount is secure and safe to use at regular intervals (at least every three months.)

• 

Please contact your distributor if you have any questions.

• 

Use the pre-installed cable management clips to route 

cables along the arms of the mount.

• 

Ensure that cables will not become tangled in the arms 

during motion.

B5.1.  

Position the four Security Clips 

Y

 behind the Display 

brackets as shown, ensuring that the flange on each 

Security Clip is aligned with the rectangular slot on 
each Display Bracket.

B5.2.

 Secure each Security Clip 

using Security Screw 

F

.

-5° / +10°

+/- 5°

F

Align Security Clip to Slot

To adjust rotation friction, loosen or tighten  
the two nuts below the Display Arms using 
supplied spanner 

H

 or a socket wrench tool.

WARNING:

Only loosen, do not remove the two nuts.

NOTE:

• Pulling and holding the spring-loaded levers 

outward will allow the lever handles to rotate 
without adjusting the tilt tension. This will allow 
for additional adjustment range.

• Alternatively, use a suitable hex key tool to 

adjust the tilt tension.

Summary of Contents for AD-WM-9080

Page 1: ...essional installer to ensure adequate structural capacity of wall including appropriate safety factor to support total weight of all equipment being mounted Drilling into electrical wires can cause death use appropriate equipment and caution when drilling holes in walls to avoid electrical cables water pipes and gas pipes Do not drill into structures unless you have established it s safe to do so ...

Page 2: ... people Use supplied drilling template Z to mark and drill holes as required Choice and supply of appropriate wall mount fasteners is the responsibility of the installer Consult a preferred fastener supplier or a structural engineer to select fasteners which are most appropriate for the weight of the display and wall construction method Wall mount must be level Verify using a quality spirit level ...

Page 3: ...o the hook on the Arm Assembly This should be completed by two people WARNING Ensure the round protrusion on the display plate sits inside the slot on the arm assembly before proceeding B4 1 Angle the display and hook the Display Brackets on to the horizontal rails of the Arm Assembly This should be completed by two people A6 2 Use supplied spanner H or a socket wrench to replace the two security ...

Page 4: ... to route cables along the arms of the mount Ensure that cables will not become tangled in the arms during motion B5 1 Position the four Security Clips Y behind the Display brackets as shown ensuring that the flange on each Security Clip is aligned with the rectangular slot on each Display Bracket B5 2 Secure each Security Clip Y using Security Screw F 5 10 5 Y F Align Security Clip to Slot To adj...

Reviews: