
Installation Method
First Fix
A Recessed Junction box
should be installed to allow
hand dryer to sit flush with the
wall.
Height
should
be
determined
from
table
overleaf
Cover Removal
Remove the Allen Screws on
either side of the hand dryer,
lift off cove. Make sure to put
the cover in a location where it
will not be damaged.
Mounting
Drill mounting holes according
to the area that the Hand
Dryer is to be installed in (see
Overleaf) & mount the hand
dryer.
Connect the electrical cables
and ensure correct Polarity.
NOTE: The Sensitivity of the
Cheetah is fixed. Do not install
with anything below the dryer
that can start the dryer. E.g.
Shelves, Radiators, above sinks
etc.
Replace Cover
Replace the cover
NOTE: The cover is earthed
through the mounting screws.
Please ensure they are firmly
attached prior to re-energising
the power supply.
Install the two Allen Screws
and test the hand dryer
Daily Use & Maintenance
External Maintenance:
•
Regularly
clean
cover
with
a
soft
cloth,
do
not
use
harsh
detergents,
Abrasive,
Acid
or
Alkali
Based
Cleaning
products
or
cleaning
brushes
as
they
may
damage
the
cover
finish.
If
using
a
chemically
impregnated cloth please test
on an inconspicuous area prior
to use to check suitability.
Internal Maintenance
After turning off the power supply, remove cover and
check all connections,
Clean away any dirt that has deposited inside the hand
dryer.
Remove the motor housing and check the brushes on the
motor for wear.
Replace worn Brushes.
Please note:
Brushes are a consumable item and are not
covered under warranty
Method Of Operation:
Insert the back
of your hands
Turn your hands
over
Rub your hands
together until dry
Packing List
ATC Cheetah Hand Dryer
User Manual
5mm Plastic wall plug x4
Allen Key
30mm Self Tapping Screws x4
ATC CHEETAH
Hand Dryer
Z-2
28
1
M/W/B
Infra-Red Sensor