Planning
Site or Satellite Closets
When determining the location of site or satellite closets, use the
following information as a guide. Show the locations on the floor plan.
a.
b.
c.
d.
e.
Keep the number of locations to a minimum.
Centrally locate the site or satellite closets among the information
outlets to minimize station wiring distances.
Site or satellite closets must be easily accessible and contain
enough ac power receptacles to serve the equipment that will be
located there. Voice terminals equipped with adjuncts that require
power can be remotely powered from:
●
a site or satellite location
●
from the main equipment room
●
information outlets.
The distance between the power supply and the voice terminal
cannot exceed 250 feet of 24-gauge wire.
Locks should be provided for the site or satellite closet doors to
prevent tampering with the equipment.
Cabling Facilities
The method of riser cable distribution between the main equipment
room and site or satellite closets is usually determined by the type of
cabling facilities (riser closets, conduit size, cabling shafts, etc.) in the
a.
b.
The preferred arrangement is to have individual cables supply each
site or satellite closet.
A second method is to have one or two large cables supply all the
site or satellite closets. This requires that smaller cables be installed
between the main riser cable and the site or satellite closet. These
smaller cables are then spliced into the main cable.
Determine the type of cabling required and mark the type and routing on
the floor plan. Also, show any additional cabling facilities required for
riser and terminal cabling.
1-13
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...