AT&T 202C Test Procedure Download Page 3

Summary of Contents for 202C

Page 1: ...4 205 501 b For private line applications the data loop meets requirements specified in Section 314 410 500 c Telephone portion of the installation meets standard de talk signaling and supervision req...

Page 2: ...is part are to be used as a troubleshooting aid during maintenance visits The interface tests in combination with the loop back test in Part 2 should enable the telco employee to isolate the trouble t...

Page 3: ...0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 2 ll 4 5 6 7 8 9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 25 STG ISS 3 SECTION 592 015 500 DATA SET 202C TYPE GRD so RO 51...

Page 4: ...wer to data set and then to test equipment Power Supply Test 3 Refer to 3 03 and perform 3 through 10 Page 4 Auto Answer Test Note If auto answer option Qis not installed in data set omit this test 4...

Page 5: ...These test calls should be made during busy hours to assure that all calls do not use the same trunks and routes Perform the test as follows 1 Establish voice communication between the data stations...

Page 6: ...0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 053 053 I 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TP2 TP2 0 0 0 0 0 0 0 0 0 0...

Page 7: ...e Error Count Bits in Error Peak Dist Reading One Minute Error Count Bits in Error 1 2 3 4 I READINGS AT 1 2 3 4 TEL Of TEST LINE QR STATION Under Control of Data Test Center a BIT ERROR COUNT MINUTE...

Page 8: ...ter is connected between the grounds of the data set and the CPE The impulse counter registers when potential differences of sufficient amplitude have developed between the separated grounds The 914 t...

Page 9: ...ta Access Arrangements on Direct Distance Dialing Network Test Require ments for Subscriber Foreign I SECTION 314 410 500 590 010 500 592 015 100 592 015 200 592 015 300 668 102 512 ISS 3 SECTION 592...

Reviews: