12
3.
Press and hold down the power button for 1 – 2 seconds until the blue power LED indicator is lit. This indicates that the
NAS is now powered on. While the NAS is being powered on, the green system status LED indicator will flash and the
blue network LED indicator will be lit as well.
4.
The NAS is ready for operation once the green system status LED indicator has stopped flashing and remains steadily
lit. At this time, you should also hear a ‘beep’ from the system buzzer. Hardware installation is now complete. Please
move on to the software installation guide to configure your system settings.
Upgrading System Memory
Notes and Precautions
All AS67 Series NAS devices support up to 16GB of memory.
Before adding or removing memory modules, please read the
following precautions thoroughly.
•
Your NAS and memory modules use high precision components and electronic connector technology. To avoid
invalidation of the warranty during your product warranty period, we recommend that:
ü
Memory for AS67 series devices may be purchased from local dealers or the online ASUSTOR Accessories Store
(
http://shop.asustor.com)
.
ü
You should not install a memory module by yourself, if you are not familiar with upgrading memory on a
computer.
ü
You should not touch the connectors or open the memory module compartment cover.
•
Addition or removal of memory modules by yourself may result in an accident or malfunction of your NAS caused by
breakage of the slot and module or a connection mistake. In this case, a repair fee will be charged.
•
Be careful not to injure your hands or fingers with sharp edges of the memory module, inner components, or circuit
boards of your NAS.