P/E-P55T2P4D User’s Manual
27
III. INSTALLATION
Power Connection Procedures
1. After all jumpers and connections are made, close the system case cover.
2. Make sure that all switches are in the off position as marked by
.
3. Connect the power supply cord into the power supply located on the back of
your system case as instructed by your system user's manual.
4. Connect the power cord into an power outlet that is equipped by a surge pro-
tector.
5. You may then turn on your devices in the following order:
a.
Your monitor
b.
External SCSI devices (starting with the last device on the chain)
c.
Your system power
6. The power LED on the front panel of the system case will light and the moni-
tor LED as well. The system will then run power-on tests. While the tests are
running, additional messages will appear on the screen. If you do not see
anything within 30 seconds from the time you turn on the power, the system
may have failed a power-on test. Recheck your jumper settings and connec-
tions or call your authorized dealer for assistance.
7. During power-on, hold down the <Delete> key to enter BIOS setup. Follow
the next section "BIOS SOFTWARE" for instructions.
(Power Connections)
III. INST
ALLA
TION