1.  Introduction 

1.1 Purpose 

This  document  provides  detailed  instructions  and  valuable  safety  information  regarding  the 

installation, electrical connection, and maintenance of following Chint Solar Crystalline Photovoltaic 
modules: 

CHSM60M(DG)/F-B    CHSM60M(DGT)/F-B    CHSM72M(DG)/F-B    CHSM72M(DGT)/F-B 

CHSM60M(DG)/F-BH CHSM60M(DGT)/F-BH CHSM72M(DG)/F-BH CHSM72M(DGT)/F-BH 

All the instructions should be read and understood before installation. The installers should 

be trained and

 

conform to all safety precautions in this guide when installing the module. Keep 

this guide in a safe place for further reference. 

1.2 Limitation of Liability 

Because the use of this manual and the conditions or methods of installation, operation, use 

and maintenance of photovoltaic  (PV)  products  are beyond  Chint  Solar’s  control,  Chint Solar 
does not afford the responsibility and expressly disclaims liability for loss, damage, or expense 
arising  out  of  or  in  any  way  connected  with  such  installation,  operation,  use  or maintenance. 
Chint Solar reserves the right to change the manual without prior notice. 

1.3 Precautions of Installation 

1.3.1 Module’s unpack and transfer 

a)  When the whole pallet of modules are delivered to the site and unloaded, make sure the 

safety of the modules especially if they need to be lifted for roof projects. Put them into a 

protective device and then lift it to the roof in case of bumping against the wall during the 

lifting process. 

b)  Firstly, tear the stretch film, then move away the top cover after cutting off each module 

packing strip while unpacking. Two operators work as a group, grasp the module frame 

tightly in the same direction and take out the module one by one. It is a must that the 

operators remove the adhesive tape of the fixed module one by one, rive one piece and 

then take out one piece of module. We don’t allow to tear off all the adhesive tape at one 

time to prevent the whole package from toppling over or falling down. The whole process 

must be taken very gently. Don’t collide with any hard objects or let any parts of the frame 

touch and drag on the ground. 

c)  After unpacking the modules should be installed that day as far as possible. It’s 

Summary of Contents for CHSM60M(DG)/F-B

Page 1: ...nt com Crystalline Silicon PV Module Installation Manual 1 Introduction 1 1 Purpose 1 2 Limitation of Liability 1 3 Precautions for Installation 2 Safety 2 1 General Safety 2 2 Installation Safety 3 M...

Page 2: ...ense arising out of or in any way connected with such installation operation use or maintenance Chint Solar reserves the right to change the manual without prior notice 1 3 Precautions of Installation...

Page 3: ...ooftop the number of each stack is suggested no more than 20 In case of the poor load bearing capacity it s recommended that the designer and or installer check with the structural engineer or archite...

Page 4: ...e modules 2 1 10 Do not scratch or hit at the back sheet the glass the terminal box Do not pull the cables or touch them with bare hands 2 1 11 Do not drill holes in the frame or scratch the anodized...

Page 5: ...t the mounting surface touching the junction box 2 2 17 Standing on the solar PV module is forbidden and also prohibit installation tools or other objects hitting surface of the solar PV module 2 2 18...

Page 6: ...s available as shown in figure 3 While installing the module frame should be parallel to the mounting rack to avoid casting shadow on the rear side as shown in figure 4 Figure 1 Figure 2 Figure 3 Figu...

Page 7: ...Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com Figure 5 3 2 2 Clamping on the frame surface 3 2 2 1 Double glass module During the installation of bifacial modules the fram...

Page 8: ...e added for additional support 3 As for above figure 7 indicates the allowable installation range of the aluminum clamp the recommended installation location is 50 200mm For this installation the modu...

Page 9: ...omponents b The bar s top surface contacted with module frame should come with grooves compatible with an M8 bolt c If the bars do not come with grooves holes of a suitable diameter may need to be dri...

Page 10: ...roduce more current and or voltage than reported at standard test conditions Accordingly the value of Isc marked on this module should be multiplied by a factor of 1 25 when determining component cond...

Page 11: ...wire around the bolt Note that the copper wire cannot be attached directly to the aluminum 4 2 4 Put the bolt through the cut washer and then through the hole in the aluminum frame 4 2 5 Add the spri...

Page 12: ...th Dust weather Right away after the dust wind The period of the PV module cleaning shall be determined by the condition of the weather pollution O M operator shall keep a record of weather condition...

Page 13: ...g District Hangzhou P C 310053 Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com CHINT SOLAR ZHEJIANG Co Ltd Add 1335 Bin an Rd Binjiang District Hangzhou China 310053 Tel 86...

Reviews: