
Astria.US.com
126770-01_B
13
Figure 18 - Screw and Hood Placement
Screws
Figure 16 - Installing Rear Wall
Figure 19 - Installing Fireplace Screen
Rating
Plate
Hole for
Screen Rod
Leading
Bricks
GROUTING INSTRUCTIONS
Note: Grouting material provided with mosaic brick kit
1. Moisten brick surface with damp sponge or spray bottle just prior
to application. When bricks are wet, any excess grout mixture
on bricks will easily wipe off.
2. In a heavy duty mixing bucket, add equal parts cement and sand.
Add enough water and mix together well using a power drill with
mixing wand attachment to a yogurt like consistency. Not adding
enough water can lead to grout falling out after burning.
3. The overall length of piping bag should be about 16". If the bag is
longer than 16", cut it down to size by removing end with larger
opening. This will make the bag easier to handle.
4. Put grout mixture into piping bag making sure the smaller
opening is downward and over a moist towel to avoid spilling.
Place a wet towel over the bucket making sure it is directly on
the surface of grout mixture. This will keep the mixture moist
and it will not dry out before use.
5. Grout all joints where two firebrick walls come together.
6. Using a trowel, remove excess grout mixture by moving trowel
in the direction of the joint. Grout mixture in the joint should now
be flush with brick surface. If not enough grout is applied into
each space, grout may fall out after burning.
7. Using a joint striker, smooth out grout line.
Allow 72 hours
before operating fireplace
.
ESTATE REFRACTORY PANELS INSTALLATION
Note:
Remove screen assemblies and all hardware components out
of the box prior to installation.
1. Install bottom brick panel. Using at least two people, hold bot-
tom brick panel by its side edges. Place the back edge of bottom
panel into the firebox first and carefully lower the front edge of
panel. Make sure bottom panel is centered in the firebox and
flush with the front of the fireplace. Be careful not to pinch your
fingers between the panel and firebox.
2. Install rear brick panel. This panel has a top and bottom side.
To determine correct position, match up the pattern on the rear
panel with the right and left brick panels before installing. Make
sure rear panel is centered before continuing.
3. Install the right and left brick panels with the gas line knock outs
placed down toward the bottom refractory. Align the right an left
brick panels with the rear panel so the grout lines line up.
4. Install upper corner brackets and tighten set screws (see Figure
17).
Figure 17 - Installing Refractory Panels
LEFT BRICK
PANEL
PANEL
RIGHT BRICK
REAR BRICK
PANEL
BOTTOM
BRICK PANEL
ASH PANEL
UPPER CORNER
BRACKET (2x)
INSTALLING FIREPLACE HOOD AND SCREENS
1. Attach hood to firebox using screws provided (see Figure 18).
1. Slide round end of screen rod into rings at top of screen. Attach one
push-on nut to end of rod before attaching last ring of screen.
2. Insert the round end screen rod into hole on the left and right side
of smoke shelf (Figure 19).
3. Mount flat end of screen rod with #10 x 5/8" to center of smoke
shelf.
4. Install other screen rod in same manner.
Retaining
Bracket
INSTALLATION
Continued