background image

10

Summary of Contents for Avero

Page 1: ... and Instructions for use Guarantee This product is guaranteed against all defects in manufacture for a period of one year This does not affect your statutory rights Warranty Number Avero height adjustable care bath ...

Page 2: ...here are no obstructions or items that may be trapped when the bath is operated Check the tub will raise and lower properly using the control pad Check the temperature of the water in the tub before use Instructions for use Tub Controls There are Two control pad options for the Tub 3 Button and 7 Button details are shown below See the diagrams for the individual control functions The green indicat...

Page 3: ...ry Light System The switch has three functions On Hold Off Press the sensory light switch to turn the lights on the lights will automatically cycle through the colour sequence which is red yellow green blue The cycle can be moved on to the next colour by pressing the light button again This may stop the cycle The green LED on the touch panel will stay lit Pressing the button once will select the n...

Page 4: ...cally You can step through your music tracks using the forward button and back through tracks using the back button To stop the player press the on off button Radio option The radio module is optional equipment The operation is the same in the MP3 playback mode The button selects the radio The receivable stations can be selected with the fast forward back buttons Additional controls are shown belo...

Page 5: ...sitioned over the tub Visually check the stretcher cover for damage and security before use Using the Neatfold stretcher To use the Neatfold stretcher when stored in a vertical position Picture A Reach across the bath and hold the centre of the stretcher frame at the point where the material has been removed to create a hand hold Lift the assembly slightly and pull it towards you Picture B A small...

Page 6: ...th the other hand hold the edge of the stretcher such that by applying a little upward force the stretcher begins to fold Allow the stretcher to fully fold in half and then move to one of the two stowed positions as appropriate Operating instructions for optional guard if fitted Ensure that the stretcher is in the horizontal position Carefully place the two vertical tubes of the guard assembly int...

Page 7: ...ply hoses for damage and leakage Service internal mixer components may require more frequent servicing in hard water areas Calibrate mixer temperatures Check cold supply failure shutdown Check condition of backup battery Check the condition and function of the electrical connection Optional Stretcher Check the condition of the stretcher covering Check the security and position over the tub Examine...

Page 8: ...Hot and cold ball type isolation valves 22mm need to be supplied maximum height of 300mm from the floor a waste suitable for connection to a 50mm O D outlet also needs to be supplied maximum height of 80mm from the floor Thermostatic taps require a minimum water pressure of 1 bar 14 5psi and maximum of 10 bar 145psi Maximum pressure ratio cold hot must not exceed 5 1 Required electrical connection...

Page 9: ... ...

Page 10: ...10 ...

Page 11: ...11 ...

Page 12: ...Unit 11F Coln Park Industrial Estate Andoversford Cheltenham Glos GL54 4HJ Tel 01242 820820 Fax 01242 821110 e mail sales astorbannerman co uk VERSION 1 Re work of translated document ...

Reviews: