Load Link
KAK-F
Manual
A.S.T. Angewandte SYSTEM-TECHNIK GmbH Dresden
Marschnerstraße 26 01307 Dresden
Phone +49(0351) 44 55 30 Fax +49(0351) 44 55 555
www.ast.de
[email protected]
Page 1: ...Load Link KAK F Manual A S T Angewandte SYSTEM TECHNIK GmbH Dresden Marschnerstraße 26 01307 Dresden Phone 49 0351 44 55 30 Fax 49 0351 44 55 555 www ast de astmr ast de ...
Page 2: ......
Page 3: ... the same area without cross communication After switching on the FFB 102 indicates the address for 2s seconds The KAK sends out the current load value with a transmission rate of 2 per second After switching on of the FFB the FFB and the KAK synchronize itself 8 time slots are available altogether If a time slot is used than another is applied The initial synchronisation of both devices takes 4 1...
Page 4: ...oad of more than 150 will result in a shift of zero and is not permitted for safety reasons Avoid bending and excessive torque Handle as a measuring instrument 4 Operating of Load Link KAK Switch on Switch off press 2 sec The green power LED indicates operating state The red low power LED indicates that the KAK has to be re charged with the battery charger plugged into the socket at the backside T...
Page 5: ...lay to zero Net mode in mode peak hold re setting the peak hold to the actual value tAr C SP PRINT short Send display value to PC ASCII string to RS232 Prt use cable xkc 021 and software xks 021a for transmission PRINT long Send display value to PC constantly with a period of 2 sec Prt LIGHT short Activate backlight Description of display Display Description KAK switched off or no communication to...