Assa Abloy PADDE Series Installation Instructions Download Page 2

CAUTION! Incorrect supply voltage may cause damage not covered by warranty.

Please check supply voltage with a suitable meter to ensure it is within 10-13.8V DC.

Current required is 250mA @ 12V DC

DO NOT OIL OR LUBRICATE.

(10-13.8V DC)

250mA

Fig. 3 - Electrical Schematic

Red

Power (+)

Ground (-)

The installation of a Latch guard is recommended on outward opening

external doors.

ASSA ABLOY Australia Pty Limited, 235 Huntingdale Rd, Oakleigh, VIC 3166 ABN 90 086 451 907 ©2015

An ASSA ABLOY Group brand

•  For metal door frames, fit door mounting brackets.

•  Once door frame preparation is complete, temporarily fit strike into

   door frame to check for interference. Check that the door closes

   smoothly and that the latch extends fully past the strike keeper.

•  When strike operates correctly with latch, remove strike from

   mortice and connect wiring.

Door mounting bracket

•  Refit strike and secure, making sure no wires are being crushed.

•  Check both mechanical and electronic operation works correctly.

TUBULAR LATCH OPERATION

To ensure deadlatching, ensure

that the deadlatching pin is

depresed by the edge of the

keeper when the door is closed.

Keeper 

edge

Deadlatching

pin

ASSEMBLING STRIKE

ELECTRICAL SPECIFICATION

CHECKING FUNCTION

Metal Door Frame

Timber Door Frame

Reviews: