![Assa Abloy HES Aperio ES100-15 Installation & Operating Instructions Manual Download Page 3](http://html.mh-extra.com/html/assa-abloy/hes-aperio-es100-15/hes-aperio-es100-15_installation-and-operating-instructions-manual_2988374003.webp)
3
of 4
Screw Mounting Holes
Wire Exit Hole
Peel Away
Reader Installation
1.
PERFORM a site survey to ensure the opening is appropriate
for the ES100 installation and the RF capability is optimum.
NOTE:
See RF statement in product specifications for factors to consider.
2.
REMOVE the reader from the backplate.
3.
LEVEL and MARK the desired placement.
NOTE:
Prior to modifying the frame or mounting area, confirm
product cable length is able to accommodate the installation.
4.
MARK and CENTER-PUNCH the wire exit hole.
NOTE:
See installation
Step 8
for screw mounting option.
5.
DRILL a 3/8" hole for the reader exit wire harness.
NOTE:
Ensure harness channel is deep enough
to reach the strike body harness.
6.
REMOVE excess material from the mounting
surface and clean/prep for mounting
NOTE:
An alcohol swab is provided to clean the
mounting surface prior to installation.
7.
REMOVE the adhesive backing when ready to install.
8.
MOUNT the backplate to the marked location and apply
moderate pressure (15 psi) directly over the adhesive
area for at least 1 minute to ensure proper adhesion.
NOTE:
Screws may be used as an alternative mounting method. When
mounting this way, the VHB tape must still be used and 1/8" holes should
be drilled in the 3 locations noted in
Diagram 3
.
The reader should be secured using material appropriate, #4
flat head mounting screws and MUST be used in conjunction
with an RTV/Sealant to prevent moisture/debris ingress.
9.
Install batteries
(Diagram 4)
.
10.
Secure reader to backplate using the provided
tamper resistant torx screw and torx bit.
NOTE:
Ensure reader is fully seated against the backplate
and the screw hole is properly aligned before securing.
Strike Installation
1.
PREP the frame for the electric strike based
on PREPARING THE FRAME section.
NOTE:
If using a DPS, be sure to prep the hole so that the
wire harness can reach the back of the electric strike.
2. Monitoring:
Latch monitoring is a factory installed
option and is properly configured from the factory.
Non-monitored
strikes have factory installed
jumpers in the monitoring positions
(Diagram 6)
.
NOTES:
Latch and DPS monitoring are field installable
using the OPT-1LM kit. Simply remove the jumpers and
install/connect the kit to the strike per
Diagram 6
.
If monitoring is not used, ensure the jumpers
are properly seated prior to installation.
3. If using a DPS,
REMOVE the factory installed jumper and
CONNECT the DPS harness in its place
(Diagram 6)
.
NOTE:
DPS can only be used in conjunction with latch monitoring.
If a DPS is not being used, ensure the jumper is connected.
4.
CONNECT the electric strike to the reader main power cable
and tuck the excess wire into the frame before mounting.
NOTE:
Ensure the distance between strike and reader can be
accommodated without straining the cables and connection.
5.
SECURE the strike body and faceplate to the frame
using the provided mounting hardware.
6.
Check latch engagement and adjust the shim accordingly.
Diagram 3
Placement
& Mounting
Diagram 2
Remove Back
Cover and Mark Placement
Diagram 4
Install Batteries & Secure Reader
Strike Body
Faceplate
Window Shown
For Main Power
Connection
Reader
Diagram 5
Assembly
Diagram 6
Wiring
Strike Body
Reader
Latch Monitoring
Main Power
DPS
Jumpers
(See notess 2-4)