Control Board Replacement
18
312361L
Installation
1.
Push grommet and power cord wires into strain
relief in control board (18).
2.
Connect power cord connectors to terminals indi-
cated on control board (18).
NOTE: Route power cord (19) between coupled hose
(42) to filter manifold and sprayer frame.
3.
Slide control board into place on side of motor front
endbell.
4.
Replace three screws (11). Torque to 30-35 in-lb
(3.4-3.9 N.m).
5.
Connect motor connector (D) and pressure control
assembly connector (A).
6.
Install shroud (12) with two screws (4) (see page
15).
7.
Hi-Boy Models Only - Connect high-pressure hose
at pump outlet (see page 12).
ti6122a
18
Grommet
Strain
Relief
C
120V
240V
A
D
18
18
D
A
ti6143b
C
Bottom View of Sprayer
ti11555a
42
19
ti11553a
11
C
120V
240V
A
D
18
18
D
A
ti6143b
C
Summary of Contents for AllPro Mach 5400 Plus 110V
Page 27: ...Notes 312361L 27 Notes ...