ASIC Bitmain Antminer S9K Maintenance Manual Download Page 10

 

                                                                                      S9k S9SE Maintenance Guide 

 

10 

 

 

 

S9K S9SE maintenance ideas 

During the maintenance, conduct 10 tests before and after the main test chip (five before and after the chip: CLKO, CO, RI, BO, NRSTO); DC-DC output and 

PIC voltage 

CORE voltage; LDO (0.8V 1.8V), PLL-0.8V. 

Detection method:   

1) When the IO line is not inserted and only 12V is inserted: the DC-DC output is about 0V, and the boost output is about 0V. The PIC power supply 

of 3.3V must be powered. The other test voltages are all 0; 

2) When the IO line is inserted and the test button is not pressed, there is no voltage output from DC-DC and boost. After pressing the test button, the 

PIC starts to work. At this time, the DC-DC outputs the voltage set by the test program of PIC jig, and boosts as it works. Then the jig outputs WORK, 

and returns to noce after computing. At this point, the normal voltage of each test point should be: 

CLKO:

 0.9V 

CO: 

1.6-1.8V, when the jig is just sent to WORK, since the CO is negative, the DC level will be lowered, and the instantaneous voltage is about 1.5V. 

RI

: 1.6-1.8V, when the voltage is abnormal or too low during computing, the computing board will be abnormal or the hashrate will be zero. 

BO

: 0V when there is no computing, there will be a pulse jump between 0.1-0.3V during computing. 

NRSTO

: 1.8V. A reset signal is re-outputted each time the test button of the jig is pressed. 

When the above-mentioned test point status or voltage is abnormal, please estimate the fault point based on the circuit before and after the test point. 

 

 

  

Details and distinction of S9K S9SE chip’s configuration file  
 
 

 

 
 
 
 
 
 

Summary of Contents for Bitmain Antminer S9K

Page 1: ...es of the single board test jig program III Principle and Structure 1 Principle overview 1 S9K S9SE computing board is composed of 6 voltage domains connected in series There are 10 BM1393 chips in ea...

Page 2: ...chip domain distribution signal path and circuit distribution of the S9K S9SE signal board DC DC input IO J4 IO Block J4 Clamping circuit EEPROM EEPROM chip IC Domain voltage signal level shifting IC...

Page 3: ...from chip U60 to chip U1 and then returns to the control board from the pin J4 8 at IO port when the IO signal is not inserted the voltage is 1 8V and the voltage is 1 8V when computing Signal BO BI...

Page 4: ...2 Schematic diagram of DC to DC circuit 2 2 3 Schematic diagram of EEPROM IC single board test will change the magic number temperature sensing information and CRC information in the EEPROM 2 2 4 Sche...

Page 5: ...S9k S9SE Maintenance Guide 5 2 2 5 Schematic diagram of PIC U102 2 2 6 Signal test points of each chip as shown below after amplified...

Page 6: ...S9k S9SE Maintenance Guide 6 1 3 5 Signal test points in Domain 1 3 5 2 4 6 Signal test points in Domain 2 4 6 2 2 7 Pin circuit diagram of each chip in Domain 1 3 and 5 1 3 5 2 4 6...

Page 7: ...S9k S9SE Maintenance Guide 7 2 2 8 Pin circuit diagram of each chip in Domain 2 4 and 6 2 2 9 Circuit diagram of J4 at IO port...

Page 8: ...S9k S9SE Maintenance Guide 8 2 2 10 0 8V 1 8V circuit schematic diagram 2 2 11 Schematic diagram for Level signal conversion...

Page 9: ...S9k S9SE Maintenance Guide 9 2 2 12 Schematic diagram for Y1 Y2 crystal oscillator 2 2 13 LDO 0 8V 1 8V and crystal oscillator measurement...

Page 10: ...tage set by the test program of PIC jig and boosts as it works Then the jig outputs WORK and returns to noce after computing At this point the normal voltage of each test point should be CLKO 0 9V CO...

Page 11: ...nd several of the signals CLK CO BO NRST are transmitted forward U1 U60 and an abnormal fault point is found through the power supply sequence 5 When locating to the faulty chip the chip needs to be r...

Page 12: ...mple a chip itself can work but it will not forward other chip information at this time the entire signal chain will come to an abrupt end and lose a large part of it which is called broken chain The...

Page 13: ...nt signal apart from the metal exposed at the contact end the other parts of the test lead must be sealed with a heat shrinkable tube so as to prevent the test lead from contacting with the cooling fi...

Reviews: