Reference
81
Ref
eren
ce
DataLogging Setup Screen (LGST)
Use the DATALOGGING screen, Figure 4.11, to set the recording interval and
recording time for a point.
Table 4.11 describes the DATALOGGING screen fields.
Figure 4.11: Datalogging Setup Screen (LGST)
Table 4.11: Datalogging Setup Screen Field Descriptions
Field
Description
INTERVAL
Recording interval used for point, line, and area feature data
collection. Changing the recording interval creates a new file in the
receiver. Default: 2.0 seconds.
TIME ON POINT
Point occupation time . Period of logging for a point feature. The
maximum time on point is 999 epochs or 60 minutes, whichever is
smaller. Default is 0.33 minute.
DFLT
Reverts to default interval and time on point time values.
CNCL
Returns to GIS MAIN MENU disregarding any changes.
OK
Returns to GIS MAIN MENU accepting the current settings.
Summary of Contents for Reliance FS/2
Page 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Page 6: ...vi Reliance with FS 2 Field Operations Manual...
Page 14: ...xiv Reliance with FS 2 Field Operations Manual...
Page 26: ...10 Reliance with FS 2 Field Operations Manual...
Page 150: ...134 Reliance with FS 2 Field Operations Manual...
Page 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Page 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Page 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Page 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Page 182: ...F 6 Reliance with FS 2 Field Operations Manual...