![ashtech Reliance FS/2 Operation Manual Download Page 134](http://html1.mh-extra.com/html/ashtech/reliance-fs-2/reliance-fs-2_operation-manual_2982703134.webp)
118
Reliance with FS/2 Field Operations Manual
Projection Selection Screen (PROJ)
Use the PROJECTION SELECTION screen (Figure 4.41) to select the projection for
grid coordinates.
Table 4.35 describes the PROJECTION SELECTION screen fields.
Figure 4.41: Projection Selection Screen (PROJ)
Table 4.35: Projection Selection Screen Field Descriptions
Field
Description
PROJECTION
Toggle field lets you select the projection: LAMBERT, TRANSVERSE
MERCATOR, OBLIQUE MERCATOR, or POLAR STEREOGRAPHIC.
LAT, LNG
Enter latitude and longitude coordinates of grid origin.
NORTHING, EASTING
Enter northing and easting coordinates of the origin.
STANDARD PAR
Additional projection parameters.
PARM
Opens the PROJECTION PARAMETERS screen.
CNCL
Returns to DISPLAY SETUP screen disregarding any changes.
OK
Returns to DISPLAY SETUP screen accepting the current settings.
Summary of Contents for Reliance FS/2
Page 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Page 6: ...vi Reliance with FS 2 Field Operations Manual...
Page 14: ...xiv Reliance with FS 2 Field Operations Manual...
Page 26: ...10 Reliance with FS 2 Field Operations Manual...
Page 150: ...134 Reliance with FS 2 Field Operations Manual...
Page 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Page 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Page 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Page 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Page 182: ...F 6 Reliance with FS 2 Field Operations Manual...