![Ashland I-130XL2 Parts Manual Download Page 35](http://html1.mh-extra.com/html/ashland/i-130xl2/i-130xl2_parts-manual_2982288035.webp)
ASHLAND SCRAPERS
Maintenance Check list
1. Grease all zerks.
a)
Every 8 hours of operation.
b)
See Lubrication Points section on next page.
2. Greasing the hubs.
a)
Re-pack wheel bearings after 300 hrs of operation.
b)
Completely clean grease out of hub and bearings every 1200 hours of operation.
3. Check tire pressure.
a)
See Tire Pressure Chart.
4. Check all pins for signs of wear.
a)
Daily
5. Check wheel lug nut torque.
a)
After first 2 hours of operation.
b)
Recheck daily for next 2 weeks.
c)
Tighten wheel lug nuts in a star pattern.
d)
Torque wheel lug nuts (See Torque Specifications).
6. Check and retighten all bolts.
a)
After initial 10 hours of use.
b)
Again after 50 hours of use.
c)
See Torque Specifications.
7. Inspect cutting edges.
a) Daily
b)
Replace cutting edges when center blade has been worn to approximately 6” and side
edges worn to approximately 4”.
CAUTION!
Failure to replace worn cutting edges may result in unnecessary wear to the
earthmover sides and floor.
Note: Please specify left or right “L” shaped cutting edges when ordering replacements.
Left or right side parts are determined by viewing from rear of the scraper.
PH: 715-682-4622 FX: 715-682-9717
www.ashlandind.com
34