Make sure the wing nuts are
parallel to the support rails
to ensure the loom folds.
Once all the heddle frames have
been attached, re-adjust the
Texsolv cords so that the front
heddle frame hangs approx
25mm (1") below the castle top
and the rear heddle frame hangs
approx 10mm (½") below. The
holes in the levers are drilled so
that the back heddles frames lift
more than the front. This results
in all the warp threads being level
when the levers are in the rest
position. Once you have adjusted
the position of the heddle frames
to your satisfaction, you may
choose to cut the cord at least 3
slots from the screw head.