Asgard Parcel Delivery Box Assembly Instructions Download Page 2

K  ( 1:3 )

K

ASGARD

MEDIUM 

PARCEL BOX

ITEM

NO

PART

DESCRIPTION

QTY

1

2

3

1

4

12

ASGARD

ASGPAR2###

INSTALLATION INSTRUCTIONS

BASE INSTRUCTIONS

A FIRM, LEVEL ,FLAT SURFACE IS 
REQUIRED AS A BASE FOR THIS UNIT 
SUCH AS CONCRETE OR FLAGS.

- MINIMUM BASE MEASUREMENT
  (550W*400D)

TOOLS REQUIRED

 - POSI-DRIV SCREWDRIVER
   (POWER DRIVER RECOMMENDED)

 
 - 6mm DIA MASONRY DRILL
 - 13mm SOCKET SPANNER

   (FOR ANCHOR FIXINGS)
 

 

 ANCHORING 

OF UNIT

THIS UNIT HAS BEEN DESIGNED 
TO RAISE THE FLOOR OFF THE 

CONCRETE SLAB BY PLACING 
PACKING PIECES NEARTHE FIXING
POINTS IN THE BASE.3 PER CORNER

 - SLIDE THE PACKING PIECES UNDER THE
  CORNERS OF THE UNITS WHERE SHOWN

 - MARK THROUGH THE FOUR HOLES

  IN THE FLOOR OF THE UNIT.
  DRILL THE BASE USING 6mm DIA 
  MASONRY DRILL TO A DEPTH OF 70mm. 

 - SCREW IN THE ANCHOR FIXINGS.
  (THESE HAVE A SELF CUTTING THREAD)

PLEASE SEE OUR WEBSITE FOR DETAILS

OF MAINTENANCE OF THIS PRODUCT
WWW.ASGARDSSS.CO.UK

ZSCREW32

M7.5*60 ANCHOR BOLT

ZCOMPPLAS 24

5mm PACKERS

045759

HDU BOX ASSY

2

1

3

THIS UNIT HAS BEEN DESIGNED 
TO BE FLOOR STANDING ONLY

 - PLEASE NOTE IF ANCHORING UNIT
 NEAR A WALL PLEASE ALLOW 
ENOUGH SPACE FOR LID TO OPEN 

25MM BEYOND BOX BACK.

500,00

34

8,

00

OPENING SIZE: 500X348MM 

4

ZST197 ASGARD PACEL
DELIVERY BOX LABEL

1

Reviews: