Aseptico ECONO AIR SYSTEM ADU-07 Operation & Instruction Manual Download Page 2

Your new Aseptico ADU-07 Econo Air System is one of the finest handpiece control systems 
available to the professional.  This economical system provides dental operatories, hygienists’ 
rooms or satellite offices with two manually activated handpiece controls. 

Congratulations!

 

This system is engineered to provide many years of reliable service. Please read the instructions 
provided in this manual to receive the best and longest service from your Aseptico equipment.

INSTALLATION: 

Before you install your ADU-07 unit, locate a 
suitable mounting surface that has access to a 
clean, filtered air and water supply. 

1

.   Remove the chassis back from the front by 

unscrewing the 6-32 x 1/4 holding screws. 

2.   

Use the mounting holes on the back of the 
chassis as a marking template and secure 
the chassis back to a flat vertical surface.  
Then reattach the front of chassis to the 
mounted back.  (Fig. 1) 

3.   

Locate the 1/4" grey air supply line and the 
blue water supply line exiting from beneath 
the ADU-07 console.  Connect the grey air 
supply line to a clean regulated 60-90 PSI 
compressed air supply.  Connect the blue 
water supply line to a clean regulated 
water source such as the tap water supply 
or a remote self-contained water system.  
(Fig. 2).

Figure 1 - Chassis Mounting

BLUE

TO WATER SUPPLY
TO COMPRESSED

AIR SUPPLY

GREY

Figure 2 - Water & Air Connections

Reviews: