
Your new Aseptico ADU-07 Econo Air System is one of the finest handpiece control systems
available to the professional. This economical system provides dental operatories, hygienists’
rooms or satellite offices with two manually activated handpiece controls.
Congratulations!
This system is engineered to provide many years of reliable service. Please read the instructions
provided in this manual to receive the best and longest service from your Aseptico equipment.
INSTALLATION:
Before you install your ADU-07 unit, locate a
suitable mounting surface that has access to a
clean, filtered air and water supply.
1
. Remove the chassis back from the front by
unscrewing the 6-32 x 1/4 holding screws.
2.
Use the mounting holes on the back of the
chassis as a marking template and secure
the chassis back to a flat vertical surface.
Then reattach the front of chassis to the
mounted back. (Fig. 1)
3.
Locate the 1/4" grey air supply line and the
blue water supply line exiting from beneath
the ADU-07 console. Connect the grey air
supply line to a clean regulated 60-90 PSI
compressed air supply. Connect the blue
water supply line to a clean regulated
water source such as the tap water supply
or a remote self-contained water system.
(Fig. 2).
Figure 1 - Chassis Mounting
BLUE
TO WATER SUPPLY
TO COMPRESSED
AIR SUPPLY
GREY
Figure 2 - Water & Air Connections