Page 1: ...eries flame detectors Instruction Manual ShenZhen Asenware Test and Control Technology Co Ltd Address 701 Bd 8 Dongfangming Industry Zone Dabao Rd Baoan Shenzhen China 518101 Tel 27663815 Fax 27663815 Postal Code 518000 ...

Page 2: ...e used throughout this Operating Manual Warning Identifies a hazardous or unsafe practice which could result in severe injury or death to personnel Caution Identifies a hazardous or unsafe practice which could result in minor injury to personnel or product or property damage Note Identifies useful additional information Copyright All rights reserved by Shanghai Anysafe Technologies Corporation Any...

Page 3: ...Page 3 Of 8 Contents 1 Summary 4 2 Main Features 4 3 Technical parameters 5 4 Structure and installation 5 5 Wiring 7 6 Package transport and storage 7 7 Test 7 8 Maintaining 8 9 Appendix 8 ...

Page 4: ...ferent location We collected a large number of experimental data through market research and customers feedback We have made a big improvement based on its existing in the hardware circuitry and software algorithms IR3 Series flame detectors contain the following two kinds IR3 IR3 three wavelength infrared flame detector IR3 UVIR3double infrared and single ultraviolet flame detector 2 Main Feature...

Page 5: ...d surfaces 4 Structure and installation Caution Before installing detector please cut off the power supply ofit Notice All wiring must comply with relevant standards andregulations Notice Detectors are installed in Explosion proof areas the wiring of detector should be connected by power limit and be controlled The setting of flame detector is subject to automatic fire alarm design standards GB501...

Page 6: ...Page 6 Of 8 The shape of detector UV IR3 as follow Installation as follows Wall surface mounting Flip down mounting ...

Page 7: ...r to avoid unnecessary alarm linkage The flame detector must be tested after installation and maintenance each time Detector executes initializing setting after powering on the green lamp is always on then ends after 30 seconds Normal operation the number of flashes from green light represents the current sensitivity level Before testing examine whether the LED flashes or not if not flash the dete...

Page 8: ...op working temporarily for maintenance Cut off the area which will be maintained or the systemic logic control functions in order to avoid unnecessary alarm linkage Clean dust and impurities on the front of the detector by vacuum suction or compressed air If the lens has dirt use the alcoholic cotton to wipe the lens prohibit scratching the lens by hard object Follow the above procedure to test th...