
OVERVIEW
Prior to beginning the installation of the Citadel system:
- Take a quick inventory and make sure that you have all of the necessary components.
- Survey your antenna/ADU location with an awareness to 360 degree line-of-site
to horizon and maximum temperature 70° Celsius.
- Plot your cable run and verify lengths, conduit and hole diameters,
and connector ends (female connects to ADU)
- Determine location of Junction Box and POTS cabinet.
SYSTEM COMPONENTS
ASE-MC05G
ComCenter II Outdoor transceiver with GPS and integrated antenna
ASE-MNT20
Universal Mounting Bracket with vibration dampening
ASE-12150T
150' (45m) Composite Cable (ASE-CIT01 package)
ASE-12328T
328' (100m) Composite Cable (ASE-CIT02-EXT package)
ASE-JB03
Junction Box for ADU cable with RJ-11, RJ-45, and power (optionally includes AC/DC adapter)
1
1
1
1
1
1
1
1
1
2
3
4
5
6
7
8
ASE-PS08
Fused DC Cable - if bypassing the AC/DC adapter
ASE-CB-POTS
POTS Phone in Lockable Cabinet with 50’ (15M) RJ-11 cable
ASE-CB-UPS EXT
Uninterrupted Power Supply (UPS) battery backup (optional)
ver. 1.0