ASE Citadel CIT02 Installation Manual Download Page 2

OVERVIEW

Prior to beginning the installation of the Citadel system:

 

- Take a quick inventory and make sure that you have all of the necessary components.

 

- Survey your antenna/ADU location with an awareness to 360 degree line-of-site

 

   to horizon and maximum temperature 70° Celsius.

 

- Plot your cable run and verify lengths, conduit and hole diameters,

 

   and connector ends (female connects to ADU)

 

- Determine location of Junction Box and POTS cabinet.

SYSTEM COMPONENTS

ASE-MC05G

ComCenter II Outdoor transceiver with GPS and integrated antenna

ASE-MNT20

Universal Mounting Bracket with vibration dampening

ASE-12150T

150' (45m) Composite Cable (ASE-CIT01 package)

ASE-12328T

328' (100m) Composite Cable (ASE-CIT02-EXT package)

ASE-JB03

Junction Box for ADU cable with RJ-11, RJ-45, and power (optionally includes AC/DC adapter)

1

1
1
1
1
1
1
1
1

2
3

4

5
6
7
8

ASE-PS08

Fused DC Cable - if bypassing the AC/DC adapter

ASE-CB-POTS

POTS Phone in Lockable Cabinet with 50’ (15M) RJ-11 cable 

ASE-CB-UPS EXT

Uninterrupted Power Supply (UPS) battery backup (optional) 

ver. 1.0

Reviews: