![ASD FieldSpec 3 User Manual Download Page 102](http://html1.mh-extra.com/html/asd/fieldspec-3/fieldspec-3_user-manual_2981633102.webp)
ASD Document 600540 Rev. J
90
FieldSpec® 3 User Manual
www.asdi.com
Appendix B Reference Information
B.1.25 How long does it take for the FieldSpec
spectroradiometer to warm up?
The warm-up time of the instrument depends on the environment in which it
is used.
One hour is recommended for radiometric work.
Only 15 minutes is needed for reflectance measurements, particularly if
conserving battery life is desirable.
B.1.26 Where is my serial number?
The serial number is a five (5) digit number located on a label on the rear of
the FieldSpec spectroradiometer where the power switch is. The label also
contains the model number and MAC address for the spectroradiometer.
The serial number is also accessible in the RS
3
and Indico applications from
the splash screen or the
Help->About
menu item.
B.2
Data Conversion
When using the RS
3
application, ViewSpec can convert spectral data to
ASCII text files.
Conversion can be done one file at a time. Or, several files can be merged into
a single text file, which is a useful feature when inputting data into other
analysis programs.
B.3
Gain and Offset
Gains and offsets are determined during optimization by an optimization
algorithm in the RS
3
application. You can observe this process in the RS
3
application by depressing the
OP
button on the top right-hand toolbar. The
Figure B-4
Label with serial number.
Summary of Contents for FieldSpec 3
Page 1: ...FieldSpec 3 User Manual ASD Document 600540 Rev J 2010 by ASD Inc www asdi com...
Page 7: ...ASD Document 600540 Rev J vii FieldSpec 3 User Manual www asdi com...
Page 10: ...ASD Document 600540 Rev J x FieldSpec 3 User Manual www asdi com Notes...
Page 50: ...ASD Document 600540 Rev J 40 FieldSpec 3 User Manual www asdi com Chapter 5 Batteries Notes...
Page 90: ...ASD Document 600540 Rev J 80 FieldSpec 3 User Manual www asdi com Appendix A Troubleshooting...